3. Connect the other end of the tubing to the separator
column (or guard column, if installed). Refer also to
Installation of Dionex Ferrule Fittings (Document
No. 034213) included in the LC20 Ship Kit.
4. Connect the 25
µ
L sample loop (P/N 042857) between
ports #1 and #4 of the Rheodyne injection valve. Other
sample loop sizes are available, contact the nearest
Dionex Regional Office for information.
5. Cut two pieces of tubing for waste lines. Install a ferrule
(P/N 043276) and fitting (P/N 043275) on one end of
each of the pieces of tubing.
6. Connect the ferrule fitting end of one of the waste lines to
port #5 on the Rheodyne valve. Connect the ferrule fitting
end of the second waste line to port #6. Route the waste
lines out through the chases and place the ends of the
lines in a waste container.
LC20 Chromatography Enclosure
B-8
Doc. 034859-02 9/93
Summary of Contents for LC20
Page 6: ...Contents iv Doc 034859 02 9 93 ...
Page 8: ...LC20 Chromatography Enclosure 1 2 Doc 034859 02 9 93 ...
Page 12: ...LC20 Chromatography Enclosure 2 2 Doc 034859 02 9 93 ...
Page 24: ...LC20 Chromatography Enclosure 2 14 Doc 034859 02 9 93 ...
Page 26: ...LC20 Chromatography Enclosure 3 2 Doc 034859 02 9 93 ...
Page 29: ...Figure 3 7 Drawing Sample 3 Operation and Maintenance Doc 034859 02 9 93 3 5 ...
Page 32: ...LC20 Chromatography Enclosure 3 8 Doc 034859 02 9 93 ...
Page 34: ...LC20 Chromatography Enclosure 4 2 Doc 034859 02 9 93 ...
Page 40: ...LC20 Chromatography Enclosure 4 8 Doc 034859 02 9 93 ...
Page 42: ...LC20 Chromatography Enclosure 5 2 Doc 034859 02 9 93 ...
Page 50: ...LC20 Chromatography Enclosure 5 10 Doc 034859 02 9 93 ...
Page 52: ...LC20 Chromatography Enclosure A 2 Doc 034859 02 9 93 ...
Page 56: ...LC20 Chromatography Enclosure B 2 Doc 034859 02 9 93 ...
Page 65: ...Figure B 6 Electrochemical Cell Plumbing Schematic B Installation Doc 034859 02 9 93 B 11 ...