![Dini Argeo DFWLKI3GD Manual Download Page 6](http://html1.mh-extra.com/html/dini-argeo/dfwlki3gd/dfwlki3gd_manual_2505704006.webp)
DFWLKI3GD
6 di 9
Cable gland min-max
cable
diameters in mm
Wrench measurement in
mm
PG7
3-6
14
PG9
5-8
17
In order to connect the 220 Vac power supply:
-
unscrew the indicator’s locking screws, and the one of the fixing bracket belonging to the internal power adapter (1);
-
unscrew the locking cap of the PG9 cable gland (2);
-
put the power supply cable (3) through the PG cable gland and connect it to the internal power adapter as shown in
the figure. The wires must be installed on the lower side of the connectors. The yellow-green wire is to be connected
to the pin of the container;
-
connect with the yellow-green wire (4), the pin and the earth connector of the internal power adapter;
-
lock the internal power adapter with the appropriate bracket;
-
lock the fairlead cap of the PG cable gland;
-
close the indicator making sure that the wires do not get stuck with the front panel’s seal and the case;
-
tighten the locking screws.
N.B.: Make sure that the metallic box is closed well before using the indicator
To connect the cable coming from the platform or from the load cell/s:
-
unscrew the indicator’s locking screws;
-
unscrew the locking cap of the PG cable gland;
-
pass the load cell cable in the cable gland and connect it to the indicator following the instructions shown
in section 2 of the technical manual (TECH.MAN.REF.);
-
closing well the cap of cable gland;
-
close the indicator making sure that the wires do not get stuck with the front panel’s seal and the case;
-
tighten the locking screws.
N.B.: Make sure that the metallic box is closed well before using the indicator
1
3
2
4