![DINGLI JCPT0607DCS Operator'S Manual Download Page 50](http://html1.mh-extra.com/html/dingli/jcpt0607dcs/jcpt0607dcs_operators-manual_2505640050.webp)
OPERATOR’S MANUAL
with Maintenance Information
Maintenance
45
B-3
Inspect the Tires and Wheels
(including lock nut torque)
DINGLI requires that this procedure be
performed every 250 hours or quarterly,
whichever comes first.
Maintaining the tires and wheels in good
condition is essential to safe operation and
good performance. Tire and/or wheel failure
could result in a machine tip-over. Component
damage may also result if problems are not
discovered and repaired in a timely fashion.
1 Check the tire surface and sidewalls for
cuts, cracks, punctures and unusual wear.
2 Check each wheel for damage, bends and
cracks.
3 Check each lock nut for proper torque.
Castle nut torque, dry
25.5Nm
Castle nut torque, lubricated
19.1Nm
B-4
Test the Emergency Stop
DINGLI requires that this procedure be
performed every 250 hours or quarterly,
whichever comes first.
A properly functioning Emergency Stop is
essential for safe machine operation. An
improperly operating red Emergency Stop
button will fail to shut off power and stop all
machine functions, resulting in a hazardous
situation.
As a safety feature, selecting and operating
the ground controls will override the platform
controls, except the platform red Emergency
Stop button.
1 Turn the key switch to ground control and
pull out the red Emergency Stop button to
the on position at both the ground and
platform controls.
2 Push in the red Emergency Stop button at
the ground controls to the off position.
⊙
Result: No machine functions should
operate.
3 Turn the key switch to platform control and
pull out the red Emergency Stop button to
the on position at both the ground and
platform controls.
4 Push down the red Emergency Stop button
at the platform controls to the off position.
⊙
Result: No machine functions should
operate.
Note: The red Emergency Stop button at the
ground controls will stop all machine operation,
even if the key switch is switched to platform
control.
Summary of Contents for JCPT0607DCS
Page 3: ......
Page 5: ......
Page 15: ...OPERATOR S MANUAL with Maintenance Information Decals 10 ...