Dinex TSBH2 Operating & Maintenance Manual Download Page 2

Page 2

Introduction:

Installation:

You have purchased the new Dinex® TMP® Equipment.
Please read this manual for helpful guidelines on how to
use your Equipment. Should you have any questions 
concerning the Equipment, please call the Dinex Hotline 
at 1-888-673-4639 (Monday through Friday from 8 am to 5
pm, Eastern Standard Time).

IMPORTANT:

For your safety, read and follow all cautions,

information and warnings 

FREIGHT DAMAGE CLAIMS

Your Dinex Equipment was carefully inspected and packed
before leaving our plant. The transportation company
assumes full responsibility for the safe delivery of the
Equipment. Dinex does not assume any responsibility for
damage or loss incurred in transit. Please note any visible
damage or loss on the freight bill and have delivery per-
sonnel sign.

A freight claim should be filed immediately with the trans-
portation company. If concealed damage is discovered
after unpacking the Equipment, please file a concealed
damage claim with the transport company within 10 days
after receipt of the goods.

IMPORTANT:

All packing materials should be retained for 

return shipment.

APPLICATION AND USE

The Equipment is for commercial use in the food service
industry. It provides storage of wax bases and is operated
with a heating system.

SAFETY

The instructions contained in this manual provide impor-
tant guidelines for the Equipment user regarding a correct
and safe installation. Particular attention should be paid to
the warnings given in various parts of this manual. Never
dismantle and/or repair the appliance with the power sup-
ply in place. Especially, do not repair electrical elements if
you are not qualified for such work.

INFO:

Please note that this appliance is for commercial 

use only and must be used exclusively for the purposes 
prescribed.

SET UP

INFO:

Installation of this Equipment should be performed 

by persons qualified or licensed to install electrical 
Equipment only. It is the responsibility of the installer to
comply with all local codes.

1. Carefully remove any packing material from the unit 

and check loose packing material for small parts or 
accessories. Inspect unit for concealed damage before
putting packing material aside.

2. Make sure that the master switch on the front panel of

the unit is in the “0” position. This controls the power
supply.

3. The unit operates at 240 V, 60 Hz, single phase.

Connect the unit by the plug with the main outlet.

4. Turn the master switch to the “I” position. The pilot light

will glow, indicating that it is ON, and the blower motor
will start to run.

5. When heating is completed bring main switch into

O-position and remove the plug from the receptacle.

CAUTION:

If excessive noise or vibration is noticed, turn

the master switch OFF and check the blower wheel for
freight damage or loose objects

INFO:

Operation of this Equipment must be supervised.

The Dinex base dispenser is designed to heat unitized
stainless steel Di n ex 9”wax bases thoroughly and efficient l y
by circulating hot air over the electric heating elements
and around the bases using a high-efficiency blower 
system.

WARNING:

The unit should not be operated continuously

more than 3 hours per heating cycle to avoid damaging 
the bases. The master switch should be turned off after 
serving the last meal of the day.

LEVEL ADJUSTMENT OF THE DISPENSER SILOS

IMPORTANT:

Silo adjustment not covered under warranty.

INFO:

The spring adjustment must be performed with the 

heating system switched OFF.

1. Place about 20 bases, three to four at a time, onto the

dispenser platform. If the column goes down just a little
bit (or does not go down at all), remove the platform
and unhook the springs equally around the support.

2. The correct adjustment is when the dispensing level is

2” (5cm) higher than the upper edge. The unhooked
springs remain inside the unit as spare springs.

!

!

!

!

!

!

Operation Instructions:

!

!

!

Summary of Contents for TSBH2

Page 1: ...Operating Instructions 2 Maintenance 4 Troubleshooting 4 Replacement Parts 5 Dinex Warranty 5 Parts Diagram 6 Electrical Diagram 7 Model TSBH2 For Service Information call 1 888 673 4639 Please provi...

Page 2: ...uipment should be performed by persons qualified or licensed to install electrical Equipment only It is the responsibility of the installer to comply with all local codes 1 Carefully remove any packin...

Page 3: ...fingers or hand injuries make sure the level of the upper base is 2 5cm higher than the upper edge of the housing See Level Adjustment No 2 for Spring Adjustment 2 Check to be sure that the guide bas...

Page 4: ...r of the dispenser should be cleaned as required at least once every three months 2 Open silo lid and unload dishes CAUTION Bases may be hot Use thermal protection gloves for removal 3 A damp cloth ma...

Page 5: ...OF TRADE AND THE RIGHTS AND REMEDIES PROVIDED HEREIN ARE EXCLUSIVE AND PROVIDED IN LIEU OF ANY OTHER RIGHTS AND REMEDIES DINEX SHALL HAVE NO LIABILITY OTHER THAN AS PROVIDED IN THIS WARRANTY WHETHER...

Page 6: ...dule 2 014121403 2 Frame Supporting 3 014118208 2 Guide Basket 4 014004105 24 Spring 5 Gram 5 014004106 8 Spring 10 Gram 6 4142275 1 Handle Push 7 014000129 2 Caster 5 With Brake 8 014000128 2 Caster...

Page 7: ...nce Number Part Number Description 1 014001054 Plug 20 Amp 240 Volt 2 014001501 Cord 8 14 3 AWG 3 019014970 Switch Main ON OFF 4 014001209 Thermostat 68 338 F 5 014001211 Thermostat Limit 6 014001110...

Page 8: ...DINEX INTERNATIONAL INC 628 2 HEBRON AVENUE GLASTONBURY CT 06033 1 800 523 9752 WWW DINEX COM Page 8...

Reviews: