EN-4
452163.66.72 · FD 9908
www.gdts.one
English
LA 25TU-2 - LA 40TU-2
3 Scope of supply
3.1 Basic device
The heat pump contains the components listed below.
The refrigeration circuit is "hermetically sealed" and contains the
fluorinated refrigerant R449A included in the Kyoto protocol. In-
formation on the GWP value and CO
2
equivalent of the refriger-
ant can be found in the chapter Device information. The refriger-
ant is CFC-free, non-ozone depleting and non-combustible.
1)
Evaporator
2)
Liquefier
3)
Ventilator
4)
Switch box
5)
Compressor 1
6)
Compressor 2
7)
Filter dryer
8)
Expansion valve
9)
Collector
3.2 Switch box
The switch box is located in the heat pump. It can be swung out
after removing the lower front cover and loosening the fastening
screw located in the upper right-hand corner.
The switch box contains the supply connection terminals as well
the power contactors and the soft starter unit.
The plug connectors for the control line are located on the switch
box panel near the pivotal point.
3.3 Heat pump manager
Use the heat pump manager included in the scope of supply to
operate the air-to-water heat pump.
The heat pump manager is a convenient electronic regulation
and control device. It controls and monitors the entire heating
system based on the external temperature, as well as domestic
hot water preparation and safety systems.
The customer must install the external temperature sensor,
which is included in the scope of supply of the unit heat pump
and manager together with the necessary fixing accessories.
The enclosed operating instructions describe the function and
use of the heat pump manager.
4 Transport
ATTENTION!
!!
When transporting the heat pump, ensure that it is not tilted more than
45° (in any direction).
A pallet should be used to transport the heat pump to its final in-
stallation location. The heat pump is fixed to the transport pallet
by four transit bolts. These must be removed (only in the case of
LA 25TU-2). The basic device can be transported with a lift truck,
a crane, or by means of 3⁄4" pipes fed
through the holes in the base plate. The holes are to be covered
at the installation location using the 8 black dust caps which are
included in the packaging of the device (only in case of
LA 25TU-2:
The transport eyebolts must be removed after transportation,
and the sheet metal openings must be closed using the 4 vent
plugs supplied.
After transportation, the transport fastening in the device is to be
removed from both sides of the base.
ATTENTION!
!!
Before start-up, the transport fastening must be removed.
1
2
3
4
6
5
7
8
9
Remove/screw in
transport lock
Summary of Contents for LA 25TU-2
Page 2: ......
Page 26: ...EN 12 452163 66 72 FD 9908 www gdts one English LA 25TU 2 LA 40TU 2 ...
Page 38: ...FR 12 452163 66 72 FD 9908 www gdts one Français LA 25TU 2 LA 40TU 2 ...
Page 53: ...www gdts one 452163 66 72 FD 9908 A XV LA 25TU 2 LA 40TU 2 Anhang Appendix Annexes ...
Page 54: ...A XVI 452163 66 72 FD 9908 www gdts one Anhang Appendix Annexes LA 25TU 2 LA 40TU 2 ...
Page 55: ...www gdts one 452163 66 72 FD 9908 A XVII LA 25TU 2 LA 40TU 2 Anhang Appendix Annexes ...