background image

- 6 -

16

12

A

12

B

12

C

13

14

15

A

15

B

Summary of Contents for DuoHeat Duo300N

Page 1: ...1 Duo300n 1 3kW 0 38kW 9 1kWh Duo400n 1 95kW 0 47kW 13 65kWh Duo500n 2 6kW 0 54kW 18 2kWh 87452 Issue 1 December 2008 Installation Instructions...

Page 2: ...g Thermistor G Core Sensing Thermistor H Controller PCB I User Display J Peak Supply K Radiant Element L Live N Neutral P Pilot Wire E Manual Fit Connector L1 Live Storage In L2 Live Storage Out L3 Li...

Page 3: ...tanter a u objetos en suspensi n Prateleira ou objectos em suspens o Ripiano o sporgenza P ka lub cz wystaj ca F Furniture or other obstruction Mueble o cualquier obstrucci n Mob lia ou outra obstru o...

Page 4: ...4 2 1 5 6 4 1 Feet 2 Accessories Bag 1 Patas 2 Bolsa de accesorios 1 P s de apoio 2 Saco de acess ries 1 Piedini 2 Sacchetto accessori 1 Nogo 2 Worek z akcesoriami 1 2 1 2 10mm 1 1 2 10A 10B...

Page 5: ...Punta da 8mm 3 Inserti in fibra n 10 in dotazione 4 Lunghezza inserto 15mm 1 Cegla 2 Wierto 8mm 3 3 No 10 4 D ugo ko ka rozporowego 15mm 5 Plaster 6 Low density block 7 Special fixing 5 Yeso 6 Pared b...

Page 6: ...6 16 12A 12B 12C 13 14 15A 15B...

Page 7: ...7 2 1 18B 18 19A 19B 19C 19E 19F 18A 19D...

Page 8: ...deeper than insert length Plasterboard If possible locate studding and use No 10 woodscrews directly into the wood otherwise M5 intersets For other wall types seek specialist advice WARNING If during...

Page 9: ...of the radiator ensuring it is secure during transit The off peak mains cable will be secured with cable ties Prior to installing the radiator unclip the direct acting mains cable do not remove or dis...

Page 10: ...the screws along its top edge Fig 12A Carefully lift the bottom of the front inner panel out of the retaining flange at the base of the radiator Fig 12B and remove the internal packaging Fig 12C taki...

Page 11: ...ORTANT 20 The wires in the direct acting supply cable are coloured in accordance with the following code GREEN YELLOW EARTH BLUE NEUTRAL BROWN LIVE BLACK PILOT WIRE ELECTRICAL CONNECTION The BLACK pil...

Page 12: ...f diagnostic function that enables both service engineers and end users to diagnose faults Make sure that the peak supply is on before starting the diagnostic function Adjust the LED s down until only...

Reviews: