background image

- 12 -

2. 

To check the radiant panel operation (comfort 

heat).

(i)  Adjust the temperature control display as follows; 

press down the 

+

button until all red bars are 

illuminated (shown below).  After 2 minutes the 

front panel should now feel warm, this will confi rm 

correct operation.

(ii) If the front panel does not heat up and room 

temperature is below 26°C, remove front panel 

and ensure there is no damage to front panel or 

radiant element and that all electrical connections 

are secure.  If front panel is still not heating up, 

phone customer help line.

NOTE:  If room temperature is above 26°C, radiator 

will not operate.

I

MPORTANT

Once radiator has been confi rmed as fully 

operational, use Page 2 of the ‘Operating 

Instructions’ to set up initial customer 

settings.

Please ensure the “Operating Instructions” are 

left with the radiator for user information.

DuoHeat has a built in self diagnostic function that enables 

both service engineers and end users to diagnose faults.

Make sure that the peak supply is on before starting the 

diagnostic function.

Adjust the LED’s down until only the blue frost protection 

LED is illuminated.

Press and hold the

-

button for 10 seconds until the blue 

LED goes off then release the 

-

button.

The LED’s will now come on one at a time - this indicates 

that the radiator is running the diagnostic checks.

A fl ashing LED will then illuminate to indicate a pass or fail.

Pass - 8th LED fl ashes -  if Delta Dor is not connected 
 

 

 

    or in Comfort Mode.

Pass - 9th LED fl ashes -  if Delta Dor is in Setback mode.

Fault Conditions

1st Red LED fl ashing - Room temperature sensor fault.

2nd Red LED fl ashing - Core temperature sensor fault.

3rd Red LED fl ashing - Radiant Panel temperature fault.

Contact Customer Helpline if any of the above faults are 
detected.

CHECK PROCEDURE FOR INSTALLERS FOLLOWING INSTALLATION

THIS CHECK PROCEDURE SHOULD BE CARRIED OUR BY A COMPETENT INSTALLER ONLY.

THE OPERATING INSTRUCTIONS ARE AVAILABLE FOR END USERS.

Summary of Contents for DuoHeat Duo300N

Page 1: ...1 Duo300n 1 3kW 0 38kW 9 1kWh Duo400n 1 95kW 0 47kW 13 65kWh Duo500n 2 6kW 0 54kW 18 2kWh 87452 Issue 1 December 2008 Installation Instructions...

Page 2: ...g Thermistor G Core Sensing Thermistor H Controller PCB I User Display J Peak Supply K Radiant Element L Live N Neutral P Pilot Wire E Manual Fit Connector L1 Live Storage In L2 Live Storage Out L3 Li...

Page 3: ...tanter a u objetos en suspensi n Prateleira ou objectos em suspens o Ripiano o sporgenza P ka lub cz wystaj ca F Furniture or other obstruction Mueble o cualquier obstrucci n Mob lia ou outra obstru o...

Page 4: ...4 2 1 5 6 4 1 Feet 2 Accessories Bag 1 Patas 2 Bolsa de accesorios 1 P s de apoio 2 Saco de acess ries 1 Piedini 2 Sacchetto accessori 1 Nogo 2 Worek z akcesoriami 1 2 1 2 10mm 1 1 2 10A 10B...

Page 5: ...Punta da 8mm 3 Inserti in fibra n 10 in dotazione 4 Lunghezza inserto 15mm 1 Cegla 2 Wierto 8mm 3 3 No 10 4 D ugo ko ka rozporowego 15mm 5 Plaster 6 Low density block 7 Special fixing 5 Yeso 6 Pared b...

Page 6: ...6 16 12A 12B 12C 13 14 15A 15B...

Page 7: ...7 2 1 18B 18 19A 19B 19C 19E 19F 18A 19D...

Page 8: ...deeper than insert length Plasterboard If possible locate studding and use No 10 woodscrews directly into the wood otherwise M5 intersets For other wall types seek specialist advice WARNING If during...

Page 9: ...of the radiator ensuring it is secure during transit The off peak mains cable will be secured with cable ties Prior to installing the radiator unclip the direct acting mains cable do not remove or dis...

Page 10: ...the screws along its top edge Fig 12A Carefully lift the bottom of the front inner panel out of the retaining flange at the base of the radiator Fig 12B and remove the internal packaging Fig 12C taki...

Page 11: ...ORTANT 20 The wires in the direct acting supply cable are coloured in accordance with the following code GREEN YELLOW EARTH BLUE NEUTRAL BROWN LIVE BLACK PILOT WIRE ELECTRICAL CONNECTION The BLACK pil...

Page 12: ...f diagnostic function that enables both service engineers and end users to diagnose faults Make sure that the peak supply is on before starting the diagnostic function Adjust the LED s down until only...

Reviews: