![Dilog DL9110 Operating Instructions Manual Download Page 7](http://html.mh-extra.com/html/dilog/dl9110/dl9110_operating-instructions-manual_2502431007.webp)
DL9110 / DL9118
Operating Instructions
- 7 -
Table of Contents
Limited Warranty & Limitation of Liability
............................................... 6
Table of Contents
.................................................................................... 7
Introduction
............................................................................................. 9
1 User Notes
........................................................................................ 10
2 Safety Notes
...................................................................................... 11
3 Accessories
....................................................................................... 12
3.1 Standard Accessories
................................................................ 12
3.2 Optional Accessories
................................................................. 12
4 Unit Description
................................................................................ 13
4.1 Identifying parts of the unit
........................................................ 13
4.2 LCD display
............................................................................... 14
5 Using the DL9110 / DL9118
.............................................................. 16
5.1 Power On
................................................................................... 16
5.2 Battery Health Check
................................................................. 16
5.3 Remote probe (only supplied with DL9118)
.............................. 16
5.4 Continuity Tests
......................................................................... 16
5.5 Insulation Resistance Tests
....................................................... 18
5.6 Voltage Measurement and Phase Rotation
............................... 19
5.7 Single Phase High Current Earth Loop Impedance / Line
Impedance
........................................................................................ 19
5.8 Three Phase Line Impedance (DL9118 only)
............................. 21
5.9 Non trip Earth Loop Impedance / Line Impedance
................... 22
5.10 Auto RCD Test Sequence
........................................................ 23
5.11 RCD Trip Time Tests
............................................................... 25
5.12 RCD trip current (Ramp) Tests
................................................ 27
6 Electrical Specifications
.................................................................... 29
6.1 Earth Continuity ......................................................................... 29
6.2 Insulation Resistance ................................................................. 29
6.3 Earth Loop Impedance .............................................................. 29
6.4 Line Impedance ......................................................................... 30
6.5 RCD
........................................................................................... 30
6.6 Voltage/Frequency Measurement
............................................. 30
7 Environmental Conditions
................................................................. 31
8 Maintenance
...................................................................................... 32
8.1 Preparing to work on the DL9110 / DL9118.
............................. 32
8.2 Securing the DL9110 / DL9118
................................................. 32
8.3 Cleaning
..................................................................................... 32
8.4 Battery Replacement
................................................................. 33
8.6 Service and Calibration.
............................................................ 34
8.7 Spare Parts.
............................................................................... 35
Appendix A
............................................................................................ 36