OPERATOR’S MANUAL
ENTER
Enter button
Ensure the Grain Loader/Striker is in the left most position (fully pushed in)
prior to this test. Press the Enter button to perform the EMPTY CELL TEST.
A progress bar will appear on the screen. Ambient measurements are
required to perform moisture calculations. Once the test has been
performed, the unit will provide procedures to load a grain sample
(Figure
15).
Figure 15
Load Sample Screen
Load Sample
1 - Reset Striker
2 - Load Hopper
3 - Load Cell
4 - Strike
5 - Press ENTER
LOADING HOPPER
Make sure the Cell Dump Lever is in the upper position, enabling the cell to
receive grain. Fill the hopper 1/2 inch above the separation line between the
top of the hopper and the hopper compartment. Heap the grain slightly. Fill
the grain cell by pulling out the Grain Loader/Striker (Figure
16).
IMPORTANT: The Loader/Striker should be pulled to the right in a
smooth and reasonably swift stroke. After grain is
loaded, return the Loader/Striker to the left. This
operation will ensure the cell is completely filled and
leveled.
Figure 16
Loading Hopper
Hopper
Display
GAC50
Grain Loader/Striker
0XT
TM
Keypad
Cell Dump Lever
Sample Drawer
14 MEASURING MOISTURE
GAC500XT
11001-1352-200510
Summary of Contents for GAC500XT
Page 2: ...TABLE OF CONTENTS ii 11001 1352 200510 ...
Page 4: ...OPERATOR S MANUAL 2 SAFETY NOTICES GAC500XT 11001 1352 200510 ...
Page 10: ...OPERATOR S MANUAL 8 STARTUP GAC500XT 11001 1352 200510 ...
Page 18: ...OPERATOR S MANUAL 16 MEASURING MOISTURE GAC500XT 11001 1352 200510 ...
Page 20: ...OPERATOR S MANUAL 18 GRAIN SELECTION GAC500XT 11001 1352 200510 ...
Page 38: ...OPERATOR S MANUAL 36 TROUBLESHOOTING GAC500XT 11001 1352 200510 ...