
OPERATOR’S MANUAL
GAC® 2500 AGRI
11001-1626B-201405
INSTALLATION
/
11
INSTALLATION
The GAC
®
2500-AGRI unit requires minimal setup. The unit is fully
assembled and ready for operation after attaching the AC power cord and
inserting the grain drawer.
NOTE:
After unpacking, visually
inspect for damage occurring
during transit. Save all packing
materials until inspection is
complete. If damage is found,
file a claim with the carrier
immediately and notify your
DICKEY-john sales
representative.
Figure 11
Unit Dimensions
CONNECTING AC POWER
1. Securely connect power cord into the AC plug connection (
located on the back of the unit.
2. Plug the male end into an appropriate 3-wire (grounded) outlet.
The grounding pin on the line cord connects directly to the
GAC
®
2500-AGRI frame. When using an adapter ensure the
grounding wire is connected properly to a good earth ground
to prevent a shock hazard.
16.9”
18.6”
10.5”
16.2”
18.6”
13.9”
SIDE VIEW
FRONT VIEW
TOP VIEW
Summary of Contents for GAC 2500-AGRI
Page 4: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 IV...
Page 20: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 16 NAVIGATION...
Page 68: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 64 GRAIN CALIBRATIONS...
Page 70: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 66 DIAGNOSTICS...
Page 82: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 78 MAINTENANCE...
Page 84: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 80 TROUBLESHOOTING...