61
DHOLLANDIA
19.8
OAM.056.1 BOLT-ON KIT FOR TRAILER BOGIE RAILS
•
DH-SM slider liftgates can be mounted to North-American style trailer chassis by means of the kits presented in Appendix 19.7 and
19.8.
•
OAM056.1 features 2 carriers [1a - 1b] for the slide tubes [3], to be bolted to the bogie rails [4] [Figure 19.3]
•
The position D2 of the front carrier [1a] is determined by the travel position of the lift frame, as instructed. The position D1 of the rear
carrier [1b] is determined by the work position of the lift frame, as instructed. [Figure 19.4]
•
Bolt the carriers [1a - 1b] to the bogie rails L+R [4] as instructed [Figure 19.3]. Fasten the bolts with the required torque.
•
Bolt the slide tubes L+R [3] to the carriers [1a - 1b] as instructed [Figure 19.3]. Fasten the bolts with the required torque.
•
See Appendix 19.2 on page 51 for prescribed torque values.
NOTICE
The torque fastenings of all bolts should be checked after completion of the installation and weight test, and retightened if required.
•
The bush [5], used to connect the carriers [1a - 1b] to the bogie rails [4], is foreseen with 2 different outer diameters. Flip the bush [5]
around, and insert the diameter that just fits the orifices [4a] in the bogey rails [4] w
ith maximum ½” (1.5 mm) tolerance.
•
If the tolerance between the bush [5] and the orifices [4a] exceeds 1.5 mm for both sides of bush [5], contact the national DHOLLANDIA
distributor. See contract info on page 4.
Figure 19.3
Figure 19.4
Summary of Contents for DH-SM
Page 45: ...44 DHOLLANDIA EF0563 EN EF0562 EN EF0581 EN ...
Page 49: ...48 DHOLLANDIA Figure 18 1 Figure 18 2 ...
Page 56: ...55 DHOLLANDIA ...
Page 57: ...56 DHOLLANDIA ...
Page 63: ...62 DHOLLANDIA ...