background image

 

 
 

 

Parts List for: The “Dual Powered Ge-mini” 

 

 Gibralter Gemini Mount w/8'&9’ Antenna 

6    1/2"  Lock Washers 

6    1/2"  Nuts 

6    1/2" Flat Washers 

12 1/2"  Rubber Washers 

 

 

 

FEED ASSEMBLY 

3   3/4" Conduit Struts 

6   1/4" x 1 1/2" Bolts 

6   1/4" Lock Washers & Nuts 

 

OPTIONAL FOR Ku TRI  COLLAR 

3   8-32X 1" Machine Screws 

3   8-32 x 3/4" Truss Head Machine Screws 

3   8-32 Nuts 

3   3/4" O.D. Fender Washers 

 

ELEVATION ASSEMBLY 

1   18" Actuator w/HD Clamp 

1   1/2" x 4 1/2" Bolt 

1   1/2" x 2" Bolt 

2   1/2" Lock Washers 

2   1/2" Nuts 

 

(Optional on  2.7m) 

4    Back Braces 

4    1/2" x 1 1/2" Bolts 

12  1/2" Nuts 

4    1/2" Lock Washers 

4    3/8" x 1 1/2" Bolts 

4    3/8" Lock Washers & Nuts 

8    1/4" x 3/4" Bolts 

8    1/4" Lock Washers & Nuts 

4    Bent Tabs 

4    Brace Clips 

 

BOLT BAG FOR 

DH Satellite Inc. 

MGD 1/11/08 

 

RING TO MOUNT 

2   1/2" Lock Washers 

2   1/2" x 2 1/2" Bolts 

2   1/2" Nuts 

2   1/2" x 3/4"x 1/2" long Brass Bushings 

 
 

 

Antenna is not part of the bolt bag 

PAGE 2 

NOTE: 

Stainless steel or DURA-CON® hardware provided. 

*DURA-CON® is a corrosion resistant coating. 

DURA-CON®: Problem of thread-galling is eliminated. 

BASE PLATE TEMPLATE KIT 

       (optional ) 

4   3/4" x 8" J-bolts 

4   3/4" Nuts 

1   Wood Template 

Summary of Contents for Gibralter GE-MINI

Page 1: ...the 2 4 2 7m and 3m antenna from DH The 2 4m and the 3m are identical in theory with the exception of the 3m having a 48 ring with four back braces We will cover the basic installation first and addre...

Page 2: ...2 1 2 Lock Washers 2 1 2 Nuts Optional on 2 7m 4 Back Braces 4 1 2 x 1 1 2 Bolts 12 1 2 Nuts 4 1 2 Lock Washers 4 3 8 x 1 1 2 Bolts 4 3 8 Lock Washers Nuts 8 1 4 x 3 4 Bolts 8 1 4 Lock Washers Nuts 4...

Page 3: ...uare Tube 2 5 3 4 DH Satellite MGD 12 21 07 5 1 4 1 1 4 Hole 1 8 x 2 x 2 x 30 1 2 Square Tube 1 4 x 2 x 2 x 19 Square Tube Galvanized Tin Shroud 10 1 2 x 17 3 4 Front Shroud 5 1 4 deep x 20 1 4 Long 4...

Page 4: ...O D Pipe 3 16 Wall 3 4 x 1 1 2 Set Screws 4 8 1 2 8 1 2 Stow Bar End Tab 5 8 2 1 2 17 32 Hole Stow Bar End Cap 2 1 4 30 1 7 8 x 30 Tube 1 2 1 1 4 2 17 32 Hole 1 17 32 Hole 1 2 1 3 4 3 1 2 Gibralter Ge...

Page 5: ...you decide to put the bolts in after the concrete has set you must install regular hardened bolts or cut the bottom of the J bolts We recommend the bolts be installed prior to the delivery of the mou...

Page 6: ...Attach the gimball actuator clamp to the right side rear of the 2 square tube with a x 4 bolt Then take the eyebolt on the end of the actuator and put it in between the top bracket of the frame work o...

Page 7: ...a lock washer followed with a nut loosely tighten Next install the feed struts The feed struts will be installed in the remaining 3 holes Use this sequence bolt metal washer feed strut rubber washer O...

Page 8: ...y your feed horn is you will have received by default the C13F collar It is best if you have discussed with your sales rep the feed horn you are using prior to shipping so that DH Satellite can make s...

Page 9: ...edges to confirm that they are even This will confirm your dish is in perfect shape 2 Check to make sure that your feed is set to the right focal distance 3 Check that the feed is pointed precisely t...

Page 10: ...plete the installation You will find below our shipping policy and charges if any Notify Factory within 5 days ARO Delivery Red no charge Notify Factory 5 to 30 day ARO Regular no charge Notify Factor...

Reviews: