27
2
Hardware Installation
“A” to “E”
• Denotes the locations of the thermal pads.
“F” to “J”
• Denotes the locations of the mounting posts.
These mounting posts are used to mount the
heatspreader and NP900-B16C assembly onto a
carrier board.
• Use M2.5 screws with minimum length of 16 mm.
Bottom View
29.75
64.80
96.80
102.85
11.60
41.70
39.10
40.50
26.00
12.00
12.00
26.00
12.00
14.00
5.10
A
B
C
D
12.00
63.78
7.00
7.00
85.15
E
F
G
H
I
J
Summary of Contents for NP900-B16C
Page 1: ...NP900 B16C COM Express Board User s Manual 935 NP9001 000G A07800843 ...
Page 11: ...11 2 Hardware Installation Chapter 2 Hardware Installation System Board Layout ...
Page 83: ...83 4 Supported Software 3 After completing installa tion click Finish to exit setup ...
Page 85: ...85 4 Supported Software 4 After completing installa tion click Finish to exit setup ...
Page 90: ...90 4 Supported Software 4 You can now access the utility ...
Page 94: ...94 4 Supported Software 4 The screen on the right will appear Select the driver ...
Page 99: ...9 9 4 Supported Software 3 Click Finish Reboot the system for DirectX to take effect ...
Page 106: ...106 4 Supported Software 3 After completing installa tion click Finish to exit setup ...
Page 108: ...108 4 Supported Software 4 After completing installa tion click Finish to exit setup ...
Page 121: ...121 A Watchdog Timer mSuperio_Exit_Config ret W83627Hx_WDT endP end start ...