background image

- 01 -

1. Safety Introduc�ons

About This Manual

The manual mainly describes the product informa�on, guidelines for installa�on, opera�on and 

maintenance. The manual cannot include complete informa�on about the photovoltaic (PV) 

system.

How to Use This Manual

Read the manual and other related documents before performing any opera�on on the inverter. 

Documents must be stored carefully and be available at all �mes.

Contents may be periodically updated or revised due to product development. The informa�on 

in this manual is subject to change without no�ce.

 The latest manual can be acquired via 

[email protected] 

· This chapter contains important safety and opera�ng instruc�ons. Read and keep this manual 

  for future reference. 

· Before using the inverter, please read the instruc�ons and warning signs of the ba�ery and 

  corresponding sec�ons in the instruc�on manual. 

· Do not disassemble the inverter. If you need maintenance or repair, take it to a professional 

  service center. 

· Improper reassembly may result in electric shock or fire. 

· To reduce risk of electric shock, disconnect all wires before a�emp�ng any maintenance or 

  cleaning. Turning off the unit will not reduce this risk. 

· Cau�on: Only qualified personnel can install this device with ba�ery. 

· Never charge a frozen ba�ery. 

· For op�mum opera�on of this inverter, please follow required specifica�on to select appropriate 

  cable size. It is very important to correctly operate this inverter. 

· Be very cau�ous when working with metal tools on or around ba�eries. Dropping a tool may 

  cause a spark or short circuit in ba�eries or other electrical parts, even cause an explosion. 

· Please strictly follow installa�on procedure when you want to disconnect AC or DC terminals. 

  Please refer to "Installa�on" sec�on of this manual for the details. 

· Grounding instruc�ons - this inverter should be connected to a permanent grounded wiring 

  system. Be sure to comply with local requirements and regula�on to install this inverter. 

· Never cause AC output and DC input short circuited. Do not connect to the mains when DC 

  input short circuits.

2. Product Introduc�on

This is a mul�func�onal inverter, combining func�ons of inverter, solar charger and ba�ery 

charger to offer uninterrup�ble power support with portable size. Its comprehensive LCD display 

offers user configurable and easy accessible bu�on opera�on such as ba�ery charging, AC/solar 

charging, and acceptable input voltage based on different applica�ons. 

Summary of Contents for SUN-3.6K-SG01LP1-EU

Page 1: ...Hybrid Inverter User Manual R ...

Page 2: ...ystem Architecture 3 Installation 3 1 Parts list 3 2 Mounting instructions 3 3 Battery connection 3 5 PV Connection 3 4 Grid connection and backup load connection 4 OPERATION 4 1 Power ON OFF 4 2 Operation and Display Panel 5 LCD Display Icons 5 1 Main Screen 5 2 Solar Power Curve 05 19 20 21 33 3 6 CT Connection 3 7 Earth Connection mandatory 3 8 WIFI Connection 3 9 Wiring System for Inverter 3 1...

Page 3: ...or cleaning Turning off the unit will not reduce this risk Cau on Only qualified personnel can install this device with ba ery Never charge a frozen ba ery For op mum opera on of this inverter please follow required specifica on to select appropriate cable size It is very important to correctly operate this inverter Be very cau ous when working with metal tools on or around ba eries Dropping a tool m...

Page 4: ...5 RS 485 Port 6 CAN Port 7 DRMs Port 8 Parallel port 9 Func on Port 10 Generator input 16 Ba ery 17 Temperature sensor 18 WiFi Interface 11 Load 12 Grid 13 Power on off bu on 14 DC Switch 15 PV input with two MPPT 1 2 5 9 10 11 12 14 15 18 17 16 13 7 6 3 4 8 02 2 1 Product Overview ...

Page 5: ... 03 2 2 Product Size Inverter Size Moun ng bracket ...

Page 6: ...ure short circuit protec on Smart ba ery charger design for op mized ba ery performance With limit func on prevent excess power overflow to the grid Suppor ng WIFI monitoring and build in 2 strings of MPP trackers Smart se able three stages MPPT charging for op mized ba ery performance Time of use func on Smart Load Func on 2 4 Basic System Architecture The following illustra on shows basic applica...

Page 7: ...should have received the items in the following package Wall moun ng bracket x1 Hybrid inverter x1 Parallel communica on cable x1 L type Hexagon wrench x1 Stainless steel an collision bolt M8 80 x4 Stainless steel moun ng screws M6 12 x2 User manual User manual x1 Ba ery sensor x1 Wi Fi Plug op onal x1 Sensor Clamp op onal x 1 ...

Page 8: ... the television Antenna or antenna cable Not higher than al tude of about 2000 meters above sea level Not in environment of precipita on or humidity 95 Considering the following points before selec ng where to install Please select a ver cal wall with load bearing capacity for installa on suitable for installa on on concrete or other non flammable surfaces installa on is shown below Install this in...

Page 9: ...is inverter is heavy Please be careful when li ing out from the package Choose the recommend drill head as shown in below pic to drill 4 holes on the wall 52 60mm deep 1 Use a proper hammer to fit the expansion bolt into the holes 2 Carry the inverter and holding it make sure the hanger aim at the expansion bolt fix the inverter on the wall 3 Fasten the screw head of the expansion bolt to finish the ...

Page 10: ...rotector or disconnect device is required between the ba ery and the inverter In some applica ons switching devices may not be required but over current protectors are s ll required Refer to the typical amperage in the table below for the required fuse or circuit breaker size Model 3 6 5Kw Wire Size 3AWG Cable mm 2 25 Torque value max 5 2Nm ...

Page 11: ...y with a suitable cable is important for safe and efficient opera on of the system To reduce the risk of injury refer to Chart 3 2 for recommended cables All wiring must be performed by a professional person 4 In case of children touch or insects go into the inverter Please make sure the inverter connector is fasten to waterproof posi on by twist it clockwise Before making the final DC connec on or c...

Page 12: ...e number of inverters in parallel system exceeds 6pcs the master inverter DIP switch 1 2 needs be ON posi on and other i nverter s DIP switch 1 2 needs to be OFF posi on B HM G V G S T Gen start up N O Relay Neutral Earth Bond 240V Coil ATS240V DIP Switch ON 1 2 GV diesel generator startup signal relay coil open contact G V BMS 485 parallel_1 parallel_2 RS 485 BMS CAN DRMs BMS 485 RS485 port for b...

Page 13: ...3 3 3 Temperature sensor connec on for lead acid ba ery 1 2 Temp CT 11 ...

Page 14: ...t misconnect input and output connectors All wiring must be performed by a qualified personnel It is very important for system safety and efficient opera on to use appropriate cable for AC input connec on To reduce risk of injury please use the proper recommended cable as below Model 3 6Kw Wire Size 12AWG Cable mm 2 4 Torque value max 1 2Nm 5Kw 10AWG 6 1 2Nm 1 Before making Grid load and Gen port con...

Page 15: ... 13 GRID GRID LOAD LOAD GEN PORT GEN PORT N L PE N L PE N L PE ...

Page 16: ...ill trigger overload fault and cut off output to protect your appliance but some mes it s ll causes internal damage to the air condi oner Before connec ng to PV modules please install a separately DC circuit breaker between inverter and PV modules It is very important for system safety and efficient opera on to use appropriate cable for PV module connec on To reduce risk of injury please use the prop...

Page 17: ...oltage Voc of PV modules not exceeds max PV array open circuit voltage of inverter 2 Open circuit Voltage Voc of PV modules should be higher than min start voltage Chart 3 5 PV Input Voltage Inverter Model 5KW 3 6KW 370V 100V 500V 125V 425V PV Array MPPT Voltage Range No of MPP Trackers No of Strings per MPP Tracker 2 1 1 ...

Page 18: ...d cable shall be connected to ground plate on grid side this prevents electric shock if the original protec ve conductor fails For the configura on of Wi Fi Plug please refer to illustra ons of the Wi Fi Plug N L PE White wire Inverter 3 4 Black wire Grid L N CT 3 4 16 ON 1 2 Load L N PE L N PE L N PE Grid Gen ...

Page 19: ...Loads Hybrid Inverter AC Breaker DC Breaker DC Breaker Do not connect this terminal when the neutral wire and PE wire are connected together E N Link This diagram is an example for applica on that Neutral connects together with PE in distribu on box Such as Australia New Zealand South Africa etc Please follow local wiring regula ons This diagram is an example for grid systems without special requi...

Page 20: ...ve Ground Inverter No 2 slave Inverter No 1 master Home Load Battery pack BMS 485 parallel_1 parallel_2 RS485 BMS CAN DRMs DC Breaker DC Breaker DC Breaker DC Breaker for battery SUN 3 6K SG 120A DC breaker SUN 5K SG 150A DC breaker AC Breaker for grid port AC Breaker SUN 3 6K SG 40A AC breaker SUN 5K SG 40A AC breaker AC Breaker for backup load port SUN 3 6K SG 32A AC breaker SUN 5K SG 40A AC bre...

Page 21: ...ral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 A Phase Master inverter B Phase Master inverter C Phase Master inverter BMS 485 parallel_1 parallel_2 RS485 BMS CAN DRMs Home load L3 L2 L1 N BAR E BAR AC Breaker AC Breaker AC Breaker DC Breaker for battery DC Breaker DC Breaker DC Breaker CT1 CT2 CT3 CT Arrow pointing to grid SUN 3 6K SG 120A DC brea...

Page 22: ...nd Display Panel The opera on and display panel shown in below chart is on the front panel of the inverter It includes four indicators four func on keys and a LCD display indica ng the opera ng status and input output power informa on 20 Chart 4 1 LED indicators LED Indicator DC AC Normal Alarm Green led solid light Green led solid light Green led solid light Red led solid light PV Connec on norma...

Page 23: ...u on you can enter into the system setup screen which including Basic Setup Ba ery Setup Grid Setup System Work Mode Generator port use Advanced func on and Li Ba info 4 The main screen showing the info including Solar Grid Load and Ba ery Its also displaying the energy flow direc on by arrow When the power is approximate to high level the color on the panels will changing from green to red so syst...

Page 24: ...Main Screen Solar Page Solar Graph Grid Graph BMS Page Load Graph Battery Setting System Work Mode Grid Setting Gen Port Use Basic Setting Advanced Function Device info Grid Page Inverter Page Battery Page Load Page System Setup 22 ...

Page 25: ...detail page Press the Energy bu on will enter into the power curve page Back up Power Voltage Power for each Phase Back up consump on for Day and Total This is Grid detail page Press the Energy bu on will enter into the power curve page Status Power Frequency BUY Energy from Grid to Inverter L Voltage for each Phase CT Power detected by the external current sensors LD Power detected using internal...

Page 26: ... 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 6 7 8 9 10 11 12 13 14 15 Curr Volt Curr Temp SOC Energy Charge Fault Sum Data Details Data Li BMS Solar power curve for daily monthly yearly and total can be roughly checked on the LCD for more accuracy power genera on pls check on the monitoring system Click the up and down arrow to check power...

Page 27: ...7 Factory Reset Reset all parameters of the inverter Lock out all changes Enable this menu for se ng parameters that require locking and cannot be set up Before performing a successful factory reset and locking the systems to keep all changes you need to type in a password to enable the se ng The password for factory se ngs is 9999 and for lock out is 7777 This is System Setup page Factory Reset P...

Page 28: ...attery Setting Start A 30 30 40A 40A Batt Set2 This is Ba ery Setup page Start 30 Percent S O C at 30 system will AutoStart a connected generator to charge the ba ery bank A 40A Charge rate of 40A from the a ached generator in Amps Gen Charge uses the gen input of the system to charge ba ery bank from an a ached generator Gen Signal Normally open relay that closes when the Gen Start signal state i...

Page 29: ...ut will resume Float V 53 6V 20 35 50 5 Absorption V 57 6V Equalization V 57 6V Equalization Days Shutdown Low Batt Restart TEMPCO mV C Cell Batt Resistance 30 days Equalization Hours 3 0 hours 25mOhms Battery Setting Set3 Batt Recommended ba ery se ngs Battery Type AGM or PCC Absorption Stage 14 2v 57 6v 13 4v 53 6v Float Stage Torque value every 30 days 3hr 14 2v 57 6v Gel 14 1v 56 4v 13 5v 54 0...

Page 30: ...r will only provide power to the backup load connected The hybrid inverter will neither provide power to the home load nor sell power to grid The built in CT will detect power flowing back to the grid and will reduce the power of the inverter only to supply the local load and charge the ba ery Zero Export To CT Hybrid inverter will not only provide power to the backup load connected but also give p...

Page 31: ...18 00 01 00 when ba ery SOC is higher than 35 hybrid inverter will discharge the ba ery un l the SOC reaches 35 Time Of Use Time System Work Mode Batt Grid Charge Gen 01 00 05 00 08 00 10 00 15 00 18 00 5 00 8 00 10 00 15 00 18 00 01 00 Power 5000 5000 5000 5000 5000 5000 80 40 40 80 40 35 Work Mode2 For example Solar Sell Solar sell is for Zero export to load or Zero export to CT when this item i...

Page 32: ...0V Vstop 0 0V 0 0 s V2 0 0V Q2 0 00 V3 0 0V Q3 0 00 V4 0 0V Q4 0 00 0 0 s Grid Set3 Grid Setting L HVRT L HFRT HV2 0 0V HV1 0 0V LV1 0 0V LV2 0 0V LV3 0 0V 0 16S 0 16S 0 16S 0 16S 0 16S HF2 0 00HZ HF1 0 00HZ LF1 0 00HZ LF2 0 00HZ 0 16S 0 16S 0 16S 0 16S Grid Set4 Please select the correct Grid Mode in your local area If you are not sure please choose General Standard Please select the correct Grid...

Page 33: ...C at which the Smart load will switch on Also the PV input power should exceed the se ng value Power simultaneously and then the Smart load will switch on On Grid always on When click on Grid always on the smart load will switch on when the grid is present Micro Inv Input To use the Generator input port as a micro inverter on grid inverter input AC coupled this feature will also work with Grid Tie...

Page 34: ...o cuts off Earth Neutral load port N line bond via connect external relay When the inverter disconnects from the grid ATS port voltage will be 0 and the Earth Neutral bond keeps on More details please refer to le picture coil external relay closed contact L N ATS load port Inverter shell Ground cable 230V Ex_Meter For CT when in Three phase system with CHNT Three phase energy meter DTSU666 click co...

Page 35: ... 70A 30 6C 52 0 26 0Ah 0 0V 0 0A 0 0 0 50 33V 19 10A 31 0C 51 0 25 5Ah 53 2V 25 0A 0 0 0 50 30V 16 90A 30 2C 12 0 6 0Ah 53 2V 25 0A 0 0 0 4 5 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 ...

Page 36: ...DC cable Generator Grid Backup Load On Grid Home Load Battery Solar CT AC cable DC cable Smart Load Mode III With Generator Mode IV With Smart Load Grid Backup Load On Grid Home Load Battery Solar On Grid AC couple AC cable DC cable On Grid Inverter Mode V AC Couple ...

Page 37: ...r status displayed on the LCD is as detailed as possible 5 Your contact informa on In order to give you a clearer understanding of the inverter s fault informa on we will list all possible fault codes and their descrip ons when the inverter is not working properly The 1st priority power of the system is always the PV power then 2nd and 3rd priority power will be the ba ery bank or grid according t...

Page 38: ... back to normal state DC side over current fault 1 Check PV module connect and battery connect 2 When in the off grid mode the inverter startup with big power load it may report F20 Please reduce the load power connected 3 Turn off the DC switch and AC switch and then wait one minute then turn on the DC AC switch again 4 Seek help from us if can not go back to normal state Leakage current fault 1 ...

Page 39: ... is in the range of specification or not 2 Check whether AC cables are firmly and correctly connected 3 Seek help from us if can not go back to normal state F56 DC busbar voltage is too low Battery voltage low 1 Check whether battery voltage is too low 2 If the battery voltage is too low using PV or grid to charge the battery 3 Seek help from us if can not go back to normal state F58 BMS communica...

Page 40: ...ct is replaced by the company itself during the warranty period all rights and interests of the replacement product or component belong to the company Factory warranty does not include damage due to the following reasons Damage during transporta on of equipment Damage caused by incorrect installa on or commissioning Damage caused by failure to comply with opera on instruc ons installa on instruc o...

Page 41: ... 0 8 lagging Power Factor AC Output Rated Current A No of Strings Per MPPT Tracker AC Output Data 18A 2 mes of rated power 10 S 35A 1 1 25A 15 7A 21 7A 3600 5000 3960 5500 Rated AC Output and UPS Power W 50 60Hz 220 230 240Vac single phase Single Phase Output Frequency and Voltage Grid Type THD 3 Linear load 1 5 97 60 Current Harmonic Distor on Efficiency Max Efficiency 96 50 Euro Efficiency 99 90 MPPT ...

Page 42: ...5 Certifications and Standards Grid Regula on IEC62109 1 IEC62109 2 Safety Regula on EN61000 6 1 EN61000 6 3 EMC General Data Protec on Degree Opera ng Temperature Rande Cooling Noise dB Communica on with BMS Weight kg Size mm Installa on Style Warranty 25 60 45 Dera ng 30 dB Smart cooling RS485 CAN 20 5 330W 580H 232D IP65 5 years Wall mounted ...

Page 43: ...er RS485orCAN Model US2000 US2000 PLUS B4850 POWERBOXF 48Vxxxx 48Vxxxx 48Vxxxx 48Vxxxx UZ EB51 2 100 A11 Brand CCGX SOLAX UZ ENERGY SACRED SUN PYLON DYNESS GSL ENERGY 0 7 6 8 9 CAN RS485 RS485 RS485 RS485 12 3 11 0 0 0 13 CAN CAN CAN CAN RS485 RS485 RS485 HY48050 48Vxxxx BMS48150 H4850M GenixGreen Herewin techlogy Sunwoda X ratong Enershare Technology PYLON 3 0 GS10000 BPE AOBOET Alpha Ess Murata ...

Page 44: ... 42 Defini on of RJ45 Port Pin for BMS 11 Appendix II 1 No RS485B RS485 Pin CAN Pin 2 RS485A GND 3 GND 4 CANH 5 CANL 6 GND 7 RS485A 8 RS485B 1 2 3 4 5 6 7 8 RS485 Port CAN Port ...

Page 45: ... 43 1 Split Core Current Transformer CT dimension mm 2 Seconddary output cable length is 4m 12 Appendix III Lead Outside ...

Page 46: ...Add No 26 30 South Yongjiang Road Beilun 315806 Ningbo China Fax 86 0 574 8622 8852 Tel 86 0 574 8622 8957 E mail service deye com cn Web www deyeinverter com 502012021 Ver 2 0 2020 12 ...

Reviews: