Lithium Mode
Shutdown
Low Batt
Restart
80%
30%
10%
00
Battery Setting
Set3
Batt
Grid Charge
Gen Charge
Grid Signal
Gen Signal
Gen Max Run Time
0.0 hours
Gen Down Time
0.5 hours
Battery Setting
Start
A
30%
30%
40A
40A
Batt
Set2
①
②
③
This is Battery Setup page.
Start =30%---It indicates that the Generator will start when
the Battery capacity is less than 30% in Off-grid mode.
A = 40A---It indicates the Current that the Generator
charges the Battery after starting.
Gen Charge---It indicates the Switch that the Generator
charges the Battery。
Gen Signal ---It indicates whether the Generator's ATS
signal is on or off.
Start =30%---No use,Just for customization.
A = 40A--- It indicates the Current that the Grid
charges the Battery.
Grid Charge---It indicates that the grid charges the battery.
Grid Signal ---Disable.
Gen Max RunTime ---It indicates the longest time
Generator can run in one day,when time is up, the
Generator will be turned off. 24H means that it does
not shut down all the time.
Gen DownTime ---It indicates the delay time of the
Generator to shut down after it has reached the running
time.
①③
This is Grid Charge, you need select.
②
Lithium Mode--This is BMS protocol.Please reference the
document(Approved Battery).
Shutdown 10%--It indicates the inverter will shutdown if
the SOC below this value.
Low Batt 20% --It indicates the inverter will alarm if the
SOC below this value.
Restart 40% --It indicates the restart level when inverter
shutdown.
- 23 -