- 35 -
Time of use:
it is used to program when to use grid or
generator to charge the ba�ery, and when to discharge
the ba�ery to power the load. Only �ck "Time Of Use"
then the follow items (Grid, charge, �me, power etc.)
will take effect.
Note:
when in selling first mode and click �me of use,
the ba�ery power can be sold into grid.
Gen charge:
u�lize diesel generator to charge the ba�ery
in a �me period.
Time:
real �me, range of 01:00-24:00.
Note:
when the grid is present, only the “�me of use”
is �cked, then the ba�ery will discharge. Otherwise,
the ba�ery won’t discharge even the ba�ery SOC is
full. But in the off-grid mode (when grid is not
available, inverter will work in the off-grid mode
automa�cally).
Power:
Max. discharge power of ba�ery allowed.
Ba�(V or SOC %):
ba�ery SOC % or voltage at when the
ac�on is to happen.
Time Of Use
Time
System Work Mode
Batt
Grid
Charge Gen
01:00
05:00
09:00
13:00
17:00
21:00
5:00
9:00
13:00
17:00
21:00
01:00
Power
32000
32000
32000
32000
32000
32000
160V
160V
160V
160V
160V
160V
Work
Mode2
For example
During 01:00-05:00,
if ba�ery SOC is lower than 80%, it will use grid to charge the
ba�ery un�l ba�ery SOC reaches 80%.
During 05:00-08:00,
if ba�ery SOC is higher than 40%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 40%. At the same �me,
if ba�ery SOC is lower than 40%, then grid will charge the
ba�ery SOC to 40%.
During 08:00-10:00,
if ba�ery SOC is higher than 40%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 40%.
During 10:00-15:00,
when ba�ery SOC is higher than 80%, hybrid inverter will
discharge the ba�ery un�l the SOC reaches 80%.
During 15:00-18:00,
when ba�ery SOC is higher than 40%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 40%.
During 18:00-01:00,
when ba�ery SOC is higher than 35%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 35%.
Solar Sell:
“Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus
energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load
consump�on and charge ba�ery and feed into grid.
Max. sell power:
Allowed the maximum output power to flow to grid
.
Zero-export Power:
for zero-export mode, it tells the grid output power. Recommend to set it as 20-100W
to ensure the hybrid inverter won' t feed power to grid.
Energy Pa�ern:
PV Power source priority.
Ba� First:
PV power is firstly used to charge the ba�ery and then used to power the load. If PV power is
insufficient, grid will make supplement for ba�ery and load simultaneously.
Load First:
PV power is firstly used to power the load and then used to charge the ba�ery. If PV power is
insufficient, Grid will provide power to load.
Max Solar Power:
allowed the maximum DC input power
.
Grid Peak-shaving:
when it is ac�ve, grid output power will be limited within the set value. If the load
power exceeds the allowed value, it will take PV energy and ba�ery as supplement. If s�ll can’t meet the
load requirement, grid power will increase to meet the load needs.
Time Of Use
Time
System Work Mode
Batt
Charge Gen
01:00
05:00
08:00
10:00
15:00
18:00
5:00
8:00
10:00
15:00
18:00
01:00
Power
80%
40%
40%
100%
40%
35%
Work
Mode2
32000
32000
32000
32000
32000
32000
Grid
②
Grid Charge
Gen Charge
Grid Signal
Gen Signal
Gen Max Run Time
0.0 hours
Gen Down Time
0.5 hours
Battery Setting
Start
A
30%
30%
50A
50A
Batt
Set2