Product overview
devolo G3-PLC Modem 500k
8
You can assign terminal devices to a specific G3 PLC network (PAN) or specific PAN
coordinator using the PAN ID or allow the PAN client to search for the best possible
connection by itself (see also Chapter
).
Initial use of a G3-PLC network
There are two options for setting up a G3-PLC network:
쎲
First installing the PAN coordinator, then all the PAN clients
For setting up a G3-PLC network, start by putting the PAN coordinator into opera-
tion first. All PAN clients that you subsequently install can then pair with the PAN
coordinator directly.
쎲
First installing some PAN clients, then the PAN coordinator
For setting up a G3-PLC network, start by putting some PAN clients into operation
and then define a suitable location for the PAN coordinator. Communication
between the devices in the G3-PLC network is not possible until the PAN coordi-
nator is installed and online.
If a PAN client cannot join a G3-PLC network, it waits for a random amount
of time before initiating a new connection request. The maximum wait time
increases with each connection attempt, from 1 minute to 5 minutes, then
to 15 minutes and finally 30 minutes. This prevents connection requests
from occurring too frequently, helping to prevent a network overload after
a power failure.
You can find more tips and information in the Chapters titled
Summary of Contents for G3-PLC Modem 500k
Page 1: ...devolo G3 PLC Modem 500k...
Page 2: ...G3 PLC Modem 500k...