3.0
Installation
- GTD Installation, Operation, Maintenance and Parts Manual
Design Scenario
9
A tube heater system is being installed in 27.4m (L) x 15.2m (W) space with 4.3m ceilings. Two overhead
doors are located at one end and an equipment storage area exists on one side. The calculated heat load
is 110 kw.
Figure 3.1 - Poor Design
Doors and
tracks
Too Cold
Too Hot
Equipment storage
50’
80’ - 200,000 BTU, Typ. 2
Doors and
tracks
90’
Gas Supply
Doors and
tracks
Doors and
tracks
Equipment storage
Better Heat Distribution
Sidewall Vent, Type 2
15.2m
27.4m
Gas Supply
12.2m - 22 kw, Typ. 4
Figure 3.2 - Good Design
•
Two burners (55 kw each) are
placed at one end, opposite
the area of highest demand
(overhead doors).
•
Recommended mounting
heights are not observed.
•
Produces an uneven heat
distribution.
•
Four burners (30 kw each)
are placed in each corner.
Burner (hotter) ends direct
heat to areas of highest heat
demand.
•
Recommended mounting
heights observed.
•
Distributes heat more evenly.
24m - 55.0 kW
12m - 30.0 kW