
19
EDX
Series
Suspending the burner control box must be done in accordance with applicable codes listed in the Safety
section and these instructions.
The burner control box must be in straight alignment with the radiant tubes and level.
1
Determine the mounting chain locations for hanging the burner control box.
2
Fasten beam clamp, screw hook, or other type of suspension anchor to hanging point.
3
Attach and close S-hook and double-loop chain to anchor. Check that it is securely connected.
4
Attach chain assemblies and S-hooks to mounting brackets on the burner control box. Adjust chain
lengths until level and in straight alignment with the radiant tubes. The burner sight glass will be visible
from the floor.
Figure 3.14
•
Burner Control Box Assembly
- Side View
Figure 3.15
•
Burner Control Box with U-Bend
- End View
75,2 cm
40,7 cm
12,7 cm
45,8 cm
9 cm
7,6 cm
20,6 cm
1
2
3
4
Burner Sight Glass
(bottom side of the tube)
Burner Control Box tube is in
straight alignment with Primary
Combustion Chamber
30,5 cm
20,6 cm
14 cm
40,7 cm
Burner Control Box Suspension
3.0
Installation
•
Burner Control Box Suspension