
13
EDX
Series
3.0
Installation
•
Hanger Placement and Suspension
Burner
Tube
3 m Primary Combustion Chamber
Stainless Steel Tube Clamp
Radiant Emitter Tube
NOTE:
If applicable, use a secondary
combustion chamber. Refer to Chart 1.1 on
page 3.
NOTE:
Type varies depending on model.
Refer to Chart 1.1 on page 3.
* Refer to page 18 for U-Bend configuration dimensions.
** Model requires 5EA-SUB accessory package when installing in a U-Shaped configuration.
(43,9–60,0 kW models only)
71 c
m
269
cm
295 c
m
Burner Control Box
Radiant Emitter
Tube(s)
Suspension
Point
Burner Control Box
Suspension Points
Suspension
Point
Suspension Point
Igniter/Sensor Box
Figure 3.4
•
Heater Suspension Layout
NOTE:
A sticker identifying the combustion chamber(s)
is located on the swaged end of the tube(s).
Model Length (mm)
Dimension
Straight Config.
(m) *
Tube and Reflector
Suspension P
oints
Contr
ol Bo
x
Stabiliz
er
Shipping W
eight
(kg)
Stainless Steel
Ship W
eight
(kg)
Chain Set Qty
.
Straight Config.
Chain Set Qty
.
U-T
ube Config.
Optional Brass
Kn
uc
kles (P/N:
BK)
Optional Single
Mount Brac
ket
(P/N:
SMB)
U-T
ube
Config.
Onl
y
6 m
6,58
3
2
54,5
66,0
5
6
3
2
9 m
9,53
4
2
73,0
88,5
6
7
4
3**
12 m
12,47
5
2
86,5
107,0
7
8
5
3
15 m
15,42
6
2
107,0
132,0
8
9
6
4**
18 m
18,36
7
2
125,5
150,0
9
10
7
4
21 m
21,30
8
2
144,0
168,0
10
11
8
5
295 c
m
Chart 3.2
•
Mounting Requirements and Weights