background image

DRAWING FOR STEP 1

STEP 12 

INSTALL TWO ROD GUIDES

            1.Take the approximately middle of upper and

                lower connecting tube.

            2.Tighten screws to install rod guides.

STEP 11 

TEST ACTUATING BAR AND 

                   DOGGING OPERATION

            1.The top latch assembly should engage the top

               strike and the bottom latch assembly should

               engage the floor strike when the door is closed.

               If the door can be pushed open without 

               depressing the actuating bar, the upper 

               connecting tube has been over adjusted. 

               Readjust it as needed.

            2.The top and bottom latch assembly should

               disengage from the strikes freely when

               the actuating bar is depressed or dogged

               down. If they do not disengage, adjust the

               bolt in the bottom latch assembly as needed and 

               retest for proper operation.

STEP 10

INSTALL FLOOR STRIKE

            1.Let the bolt in the lower bottom latch assembly

               touch the floor and mark on floor.

            2.Drill a 5/8” dia, 1” deep hole.

            3.Let the bolt in the lower bottom latch assembly

               insert into the center hole of floor strike and 

               mark 3 anchor / screw holes on floor.

            4.Drill 3 anchor / screw holes, 1/4" dia , 1 1/8" deep.

            5.Hammer 3 anchors into 3 anchor / screw holes.

               Tighten up 3 screws.

           

STEP 13 : INSTALL 4 COVERS

                Install head cover, end cover, top latch

                cover,bottom latch cover and tighten screws.

STEP 8 

INSTALL AND ADJUST UPPER

                CONNECTING TUBE

           1.Keep the end of the tube with the threaded

              insert upward to connect it with the threaded

              bolt in the top latch  assembly

           2.Connect the other end of the tube to the

              internal mechanism of the head assembly

              by inserting the connecting pin into the 

              holes.

           3.Turn and adjust upper connecting tube

              until top latch assembly retracts properly 

              and then fix the connecting pin by bending 

              2 ends.

STEP 9 

INSTALL AND ADJUST LOWER

                 CONNECTING TUBE

           1.Keep the end of the tube with the threaded

              insert downward to connect it with the 

              threaded bolt in the bottom latch assembly

           2.Connect the other end of the tube to the 

              internal mechanism of the head assembly 

              by inserting the connecting pin into the holes.

           3.Connect bolt in bottom latch assembly with 

              lower connecting tube.

              Then, depress actuating bar and adjust lower 

              connecting tube until bottom latch assembly

              retracts properly.

              Then, fix the connecting pin by bending 2 

              ends. Do not let bolt in bottom latch assembly 

              touch floor while depressing actuating bar.

Summary of Contents for F2000V Series

Page 1: ...F FIRE RATED EXIT DEVICE 2012 03 ...

Page 2: ...hown on template Mark door as indicated on template B 2 CAUTTON BE SURE THE DISTANCE FROM BOTTOM SIDE OF DOOR EDGE TO BOTTOM OF BOTTOM LATCH ASSEMBLY IS 13 32 2 Tighten screws to install bottom latch assembly STEP 6 INSTALL TOP LATCH ASSEMBLY 1 Align vertical center line of top latch assembly and upper connecting tube as shown on template B 1 Mark door as indicated on template B 1 CAUTION BE SURE ...

Page 3: ... 4 dia 1 1 8 deep 5 Hammer 3 anchors into 3 anchor screw holes Tighten up 3 screws STEP 13 INSTALL 4 COVERS Install head cover end cover top latch cover bottom latch cover and tighten screws STEP 8 INSTALL AND ADJUST UPPER CONNECTING TUBE 1 Keep the end of the tube with the threaded insert upward to connect it with the threaded bolt in the top latch assembly 2 Connect the other end of the tube to ...

Page 4: ...Round Head 1 4 x 1 6 PCS Wood Screws Wood Screws Flat Head Floor Strike Thru Bolt 12 PCS Machine Screws Machine Screws Flat Head 1 4 20P x 3 4 12 PCS 1 4 20P x 3 4 3 PCS 14 x1 1 2 15 PCS Machine Screws Self Tapping Flat Head 5 32 x3 4 3 PCS 1 4 x 1 3 PCS Anchor Assembly 1 Assembly IF DOOR IS LESS THAN 36 REMOVE END COVER AND CUT SECTION A TO DESIRED LENGTH ...

Page 5: ...e B For F2000V Fire Rated Drill 9 32 holes inside and 3 8 holes outside for the 6 thru bolts Round Head Screws 1 4 20P x 3 4 x 6 Round Head Screws 2012 03 3 4 for LE 08 LE 08A Trim 3 4 for LE 08 LE 08A Trim 2 3 4 2 3 4 When installing 1000R x 1000V on a pair of doors a Double Door Strike DDS is required For complete template information please refer to the DDS template CENTER LINE CENTER LINE ...

Page 6: ...e and install screw but do not tighten all the way 2 Drill 2 D holes and install and tighten screws 3 Tighten screw in hole E all the way 2012 03 TEMPLATE B 2 A For 2000V Series UL Listed Drill tap for 3 1 4 20P x 3 4 machine screws 2xD E for latches Drill 3 3 16 pilot holes 2xD E for self tapping machine screws or wood screws for latches B For F2000V Fire Rated Drill 9 32 holes 2xD E inside and 3...

Page 7: ...ll the way 2 Make sure distance from door frame to line W is 2 3 Drill 2 D holes and install and tighten screws 4 Tighten screw in hole E all the way A For 2000V Series UL Listed Drill tap for 3 1 4 20P x 3 4 machine screws 2xD E for latches Drill 3 7 32 pilot holes 2xD E for self tapping machine screws or wood screws for latches B For F2000V Fire Rated Drill 9 32 holes 2xD E inside and 3 8 holes ...

Reviews: