7
TABLE OF CONTENTS
1. Introduction
......................................................................................................................
9
1.1.
Inspection ...............................................................................................................
9
1.2.
Freight Damage Claims ...........................................................................................
9
1.3.
Rigging .................................................................................................................... 9
1.3.1. Rigging the Dehumidifier ............................................................................ 9
1.3.2. Rigging the Remote Condenser .................................................................
10
2. Installation
........................................................................................................................
11
2.1.
Location of Dehumidifier .........................................................................................
11
2.2.
Duct Installation .......................................................................................................
13
2.3.
Condensate Drain Piping ........................................................................................
16
2.4.
Water Heating Applications .....................................................................................
18
2.4.1. Water Piping Connections .........................................................................
18
2.4.2. Low Water Flow Protection ........................................................................
21
2.5.
Remote Condenser (Optional) ................................................................................
21
2.6.
High Voltage Wiring ................................................................................................
24
2.6.1. High Voltage Connections ......................................................................... 24
2.6.2. Wire and Fuse Sizing ................................................................................. 25
2.7.
Controls and Sensors .............................................................................................
25
2.7.1. Wall Mount Sensor ..................................................................................... 25
2.7.2. Duct Mount Sensor ....................................................................................
25
2.8.
Auxiliary Heating Control Wiring .............................................................................
25
2.8.1. Auxiliary Heating - Dry Contact Closure ....................................................
25
2.8.2. Auxiliary Heating - Proportional Signal ...................................................... 26
2.9.
Smoke Alarm Interlock ............................................................................................
26
3.
Start-up Procedure
........................................................................................................
27
3.1.
Preliminary Inspection ............................................................................................ 27
3.2.
Outdoor Air Applications ......................................................................................... 28
3.2.1. Outdoor Air Option Equipped Units ............................................................ 28
3.2.2. Standard Systems in Conjunction with Outdoor Air ...................................
30
3.2.3. Outdoor Air Supplemental Information .......................................................
31
3.2.3.1 LC and LV Operation Modes ........................................................ 31
3.2.4. Determining if Outdoor Air Pre-Heating is Required ..................................
31
3.2.5. Approximating Outdoor Air Volume ............................................................
32
3.3.
Airflow Balancing .................................................................................................... 33
3.3.1. Blower Adjustment Procedure .................................................................... 33
3.3.2. Airflow Balancing for LC Dehumidifiers ..................................................... 34
3.3.3. Airflow Balancing for LV Dehumidifiers ......................................................
36
3.4.
Refrigeration Testing ...............................................................................................
38
3.5.
General Testing ...................................................................................................... 40
Desert Aire - LC/LV Manual
Summary of Contents for ExpertAire LC Series
Page 2: ...2 ...