Start-up request form for Total Aire units
Models QS/QV
Factory Assisted Start-Up
consists of a Desert Aire Service Department Technician to visit the job-site and provide supervisory
experience to installing contractors as they perform the required procedures as outlined in our warranty activation start-up report.
The company technician will also present an educational review of the dehumidifier’s operating and maintenance requirements.
Factory Assisted Start-Up is not an installation bid & therefore the system must be ready to run before scheduling.
CST Start-Up
is performed by a local Certified Service Technician who has been trained by Desert Aire. The CST performs all
duties listed above. In addition they will supply the “items to be supplied for start-up” as listed below. Please note charges for
refrigerant will apply if refrigerant is necessary to complete the start up.
Items to be completed by the installing contractor before any Start-Up can be scheduled:
Dehumidifier leak checked and inspected for internal concealed damage – remove access panels and inspect
the interior of the unit for transit damage. Contact Desert Aire immediately if damage is noted (800) 443-5276
Dehumidifier leveled and properly supported per the installation manuals recommendations.
Condensate P Trap installed with heat trace for winter operation.
Remote condenser plumbed, leak checked, evacuated, and charged if necessary. Some units require additional field
charging. See unit labeling for details. Refrigerant added __________ lbs.(if applicable)
All electrical connections terminated and verified for proper voltage at the unit and the condenser (if applicable)
All field controls, sensors and actuators installed and circuits verified that they are wired correctly.
If you have questions, contact Desert Aire for instructions (800) 443-5276.
Units with heat pump option – verify water flow and design temperature – See unit labeling for details. (if applicable)
Inspect all water lines for leaks and purge air from lines. (If applicable)
Verify that gas lines are installed, purged and set to the proper pressure – see label for gas pressure ratings (if applicable)
Items to be supplied by the installing contractor (Factory Assisted Start-Up only)
Equipped service vehicle and service technician – Technician will be trained.
Refrigerant manifold gauges – 2 sets
Air balancing equipment (magnehelic or manometer differential pressure gauge – one inch scale)
Volt/Amp/OHM meters in working order.
Digital thermometer with sensors.
50# of the appropriate refrigerant & scale.
Hand pump for adding oil to compressors.
If you are unable to supply any of the required equipment you must contact Desert Aire before returning this document.
I agree that all of the above has been completed as of _____________(Date) If a return trip must be scheduled due to insufficient
job-site preparation an additional purchase order must be issued to Desert Aire for re-scheduling.
A two week minimum is
needed to schedule start-up.
Once the form is completed please fax or email both pages to the Desert Aire service department.
Fax (262) 946-7400 Email: [email protected]
Signature of responsible party: _________________________ (print) _________________________________________ (sign)
Company Name:__________________________________________ Phone
#: ______________________________
N120 W18485 Freistadt Road
Germantown, WI 53022
(262) 946-7400 Fax: (262) 946-7401
www.desert-aire.com
Desert Aire - QS/QV Manual
Summary of Contents for Aura QS
Page 2: ...2 ...
Page 12: ...12 Desert Aire QS QV Manual ...
Page 60: ...60 Desert Aire QS QV Manual ...
Page 64: ...64 Desert Aire QS QV Manual ...
Page 90: ...90 Additional Comments Desert Aire QS QV Manual ...
Page 93: ...93 Desert Aire QS QV Manual ...