Figure 7. Settings menu

R. Memory Slot Number:

 Indicates the memory slot 

number.

S.  Resistance Measurement:

 Indicates the resistance 

measurement value for the respective memory slot.

Operation

General Guidelines

Use both 5-pound electrodes for Resistance 

Point-to-Point (Rtt) measurements. 
Use one 5-pound electrode, and connect the black 

test lead to ground for Resistance-to-Ground (Rtg) 

measurements. 
Ensure that the item being measured is electrically 

isolated (placed on an insulative surface). The meter will 

measure the lowest resistance path.
The meter will automatically switch its test voltage from 

10V to 100V when the measured resistance is 1 x 10

 

ohms or greater to meet the test procedure outlined in 

ESD TR53. 
Minimize crossing the test leads when possible.
When using 5-pound electrodes:

•  Place them no closer than 2" from the edge of the 

surface being measured.

•  Place them no closer than 3" to any groundable 

point.

•  Place them about 10" apart from each other for Rtt 

measurements of a worksurface.

•  Place them about 3' apart from each other for Rtt 

measurement of a floor.

Preferable electrode placements include:

•  Most commonly used area of a surface

•  Most worn area

•  Center of surface

•  Furthest area from a grounded point 
If the surface to be measured has sections (i.e. floor 

tiles, garment panels), place the 5-pound electrodes on 

different sections for Rtt measurements. 
Clean the material’s surface for test lab measurements, 

but do not clean the surface for materials that are 

already installed. Only clean and re-test the installed 

material if failure occurs. 

Measure Resistance-to-Ground (Rtg)

Test Procedure in accordance with ANSI/ESD S4.1 

section 6.4 Periodic Worksurface Testing: 
1.  Do not clean the surface. 
2.  Remove from the surface only those items that 

might interfere with the test. ESD sensitive devices 

shall also be removed. 

3.  Connect the black test lead to a grounded point. 
4.  Connect the red test lead to one 5-pound electrode, 

and place the electrode on the furthest convenient 

point on the surface. 

5.  Push the red pushbutton to perform a measurement. 

Should the 15-second electrification period appear, 

it may be bypassed by pushing the red pushbutton 

a second time. 

6.  Push the right black pushbutton to save the 

measurement, and apply an included measurement 

location label if desired. 

7.  Perform additional measurements by placing the 

electrode on the most commonly used or worn area. 

Figure 9. Applying a measurement location label to the 

edge of a workstation

Figure 8. Measuring the Resistance-to-Ground (Rtg) of a 

worksurface mat

Summary of Contents for Statguard Flooring D19290

Page 1: ...STM97 1 Floor Materials and Footwear Resistance Measurement in Combination with a Person A Compliance Verification Plan shall be established to ensure the Organization s fulfillment of the technical requirements of the ESD Control Program Plan Process monitoring measurements shall be conducted in accordance with a Compliance Verification Plan that identifies the technical requirements to be verifi...

Page 2: ...O INDUSTRIES INC Employee Owned Features and Components Digital Surface Resistance Meter Figure 3 Statguard Flooring D19290 Digital Surface Resistance Meter Figure 2 Statguard Flooring D19290 Digital Surface Resistance Meter Kit Figure 4 Digital Surface Resistance Meter features and components C B D E E G F A ...

Page 3: ...ings and Memory Recall menus to exit and return to the home screen G Battery Compartment Open this compartment to install the four AA alkaline batteries needed to power the meter Replace the batteries once the battery icon on the display is empty Home Test Results Screen H J L I K Figure 5 Home Test Results screen H Battery Life Indicator Displays the approximate life of the meter s 4 AA alkaline ...

Page 4: ...ctrode placements include Most commonly used area of a surface Most worn area Center of surface Furthest area from a grounded point If the surface to be measured has sections i e floor tiles garment panels place the 5 pound electrodes on different sections for Rtt measurements Clean the material s surface for test lab measurements but do not clean the surface for materials that are already install...

Page 5: ...5 pound electrodes and place the electrodes on the most commonly used area of the surface Use the 10 electrode spacer to space them 10 apart from each other The electrodes should also be 2 away from any edge and 3 away from any grounded point If the most used area is not obvious use two points near the center of the surface 4 Push the red pushbutton to perform a measurement Should the 15 second el...

Page 6: ...n cleaning instructions Per ANSI ESD S4 1 Worksurfaces The test specimens and electrodes shall be cleaned twice with a minimum 70 isopropanol water solution using a clean low linting cloth each time Note The item should then be conditioned for 72 hours minimum Figure 13 Measuring the Resistance Point to Point Rtt of floor materials Specifications Resistance Ranges 1 x 103 to 1 x 106 ohms 10 Volts ...

Reviews: