3651 WALNUT AVENUE, CHINO CA 91710 • PHONE (909) 664-9980 •
APR-Rework.com
Page
8
of
79
TB-10006 REV December 2018
© 2018 DESCO INDUSTRIES INC
Employee Owned
The main unit is very heavy. Please uncrate the unit
with 2 people.
DO NOT LIFT THE MAIN UNIT BY THE PCBA BOARD
HOLDER. LIFTING BY THE BOARD HOLDER WILL
DAMAGE THE ASSEMBLY!
Before setting up your equipment
•Ensure your Scarab Site Cleaning System has arrived complete
•Provide a location that allows the user to operate this machine in a
comfortable, well-spaced environment
Every Scarab Site Cleaning System has been factory
assembled and calibrated.
•
Recalibration is not necessary after initial setup.
•
Verifying calibration and product functionality is strongly
recommended prior to initial use
Power-up Sequence
•Attach an appropriate power plug to the stripped end of the power cord.
Use recommended power plugs:
•Nema 6-20
•Nema L6-20
•IEC 60309
Use the following diagrams together with the
manufacturer’s recommended procedure for hooking up
wires to a power plug
Set-up
All manuals and user guides at all-guides.com