![Desco 19668 Installation, Operation And Maintenance Manual Download Page 3](http://html1.mh-extra.com/html/desco/19668/19668_installation-operation-and-maintenance-manual_2486633003.webp)
DESCO WEST
- 3651 Walnut Avenue, Chino, CA 91710 • (909) 627-8178
DESCO EAST
- One Colgate Way, Canton, MA 02021-1407 • (781) 821-8370 • Website:
Desco.com
TB-3078
Page 3 of 6
© 2019 DESCO INDUSTRIES INC
Employee Owned
Figure 3. Installing the Zero Volt Monitor
OPERATOR 2
REMOTE JACK
OPERATOR 1
REMOTE JACK
MAT 2 CORD
MAT 1 CORD
MONITOR
GROUND CORD
10mm PUSH &
CLINCH SNAPS
10mm PUSH &
CLINCH SNAPS
WORKSURFACE 2
10mm snaps need to pierce
and clinch bottom side of mat
and be 12" - 72" apart.
10mm snaps need to pierce
and clinch bottom side of mat
and be 12" - 72" apart.
WORKSURFACE 1