www.desatech.com
119678-01C
16
INSTALLATION
Continued
PRESSURE TESTING HEATER GAS
CONNECTIONS
1. Open equipment shutoff valve (see Figure
15, page 15).
2. Open main gas valve located on or near
gas meter for natural gas or open pro-
pane/LP supply tank valve.
3. Make sure control knob of heater is in the
OFF position.
4. Check all joints from equipment shutoff
valve to gas control (see Figures 16 and
17, page 15). Apply noncorrosive leak
detection fluid to all joints. Bubbles form
-
ing show a leak.
5. Correct all leaks at once.
6. Light heater (see
Operation
, page 17).
Check all other internal joints for leaks.
7. Turn off heater (see
To Turn Off Gas to
Appliance
, page 19).
INSTALLING LOGS
WARNING: Failure to posi
-
tion the parts in accordance
with these diagrams or failure
to use only parts specifically
approved with this heater may
result in property damage or
personal injury.
It is very important to install these logs exactly
as instructed. Do not modify logs. Only use
logs supplied with heater.
1. Place ember bed in center of base as-
sembly as shown in Figure 18. Ember
bed must rest against metal stop on left
and screw on right. It is very important that
ember bed be seated correctly.
2. Rest rear log in back corner sections of
base assembly as shown in Figure 19.
Make sure log is completely vertical and
not leaning in toward burner where the
flame will touch the log.
3. Position middle log as shown in Figure
19. Pull log forward against grate prongs
making sure grooves in bottom of the log
fit against grate prongs. This log will rest
on top of bottom log.
Base
Assembly
Figure 19 - Installing Rear and Middle Logs
Ember
Bed
Rear
Log
Middle Log
Figure 18 - Installing Ember Bed
Metal Stop
Screw
Stop
Grate Prongs