STOVE AND DIRECT-VENT BURNER SYSTEM INSTALLATION

Check Gas Type
Installing Gas Piping To Stove/Burner System Location

STOVE AND DIRECT-VENT
BURNER SYSTEM INSTALLATION

INSTALLING GAS PIPING TO STOVE/
BURNER SYSTEM LOCATION

Installation Items Needed

Before installing stove and burner system, make sure you have the
items listed below.

• external regulator (supplied by installer)

• piping (check local codes)

• sealant (resistant to propane/LP gas)

• equipment shutoff valve *

• test gauge connection *

• sediment trap

• tee joint

• pipe wrench

• approved flexible gas line with gas connector (if allowed by lo-

cal codes) (not provided)

*  A CSA design-certified equipment shutoff valve with 1/8" NPT
tap is an acceptable alternative to test gauge connection. Purchase
the CSA design-certified equipment shutoff valve from your dealer.
See Accessories, page 39.

For propane/LP connections only, the installer must supply an
external regulator. The external regulator will reduce incoming gas
pressure. You must reduce incoming gas pressure to between 11 and
14 inches of water. If you do not reduce incoming gas pressure,
burner system regulator damage could occur. Install external regu-
lator with the vent pointing down as shown in Figure 38. Pointing
the vent down protects it from freezing rain or sleet.

 WARNING: A qualified service person must con-

nect burner system to gas supply. Follow all local
codes.

 CAUTION: For propane/LP units, never connect

burner system directly to the propane/LP supply.
This burner system requires an external regulator
(not supplied). Install the external regulator between
the burner system and propane/LP supply.

CHECK GAS TYPE

Use proper gas type for the burner system unit you are installing. If
you have conflicting gas types, do not install burner system. See
dealer where you purchased the stove and burner system for proper
burner system according to your gas type.

Installation must include an equipment shutoff valve, union, and
plugged 1/8" NPT tap. Locate NPT tap within reach for test gauge
hook up. NPT tap must be upstream from burner system (see Figure
39, page 19).

IMPORTANT:

 Install equipment shutoff valve in an accessible

location. The main gas valve is for turning on and shutting off the
gas to the appliance.

Check your building codes for any special requirements for locating
equipment shutoff valve to stoves.

Apply pipe joint sealant lightly to male NPT threads. This will
prevent excess sealant from going into pipe. Excess sealant in pipe
could result in clogged burner system valves.

  WARNING: Use pipe joint sealant that is resistant

to liquid petroleum (LP) gas.

Figure 38 - External Regulator with Vent Pointing Down
(Propane/LP Only)

 CAUTION: Use only new, black iron or steel pipe.

Internally-tinned copper tubing may be used in cer-
tain areas. Check your local codes. Use pipe of 1/2"
diameter or greater to allow proper gas volume to
burner system. If pipe is too small, undue loss of
volume will occur.

External
Regulator

Vent
Pointing
Down

Propane/LP
Supply Tank

Summary of Contents for CDVBNC

Page 1: ...any other appliance FOR YOUR SAFETY WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch Do not use any phone in your building Immediately call your gas su...

Page 2: ...gases are odorless An odor making agent is added to the gas The odor helps you detect a gas leak However the odor added to the gas can fade Gas may be present even though no odor exists Make certain y...

Page 3: ...paper or other objects 13 Never place anything on top of stove 14 Do not use any solid fuels wood coal paper cardboard etc in this stove Use only the gas type indicated on burner system nameplate 15...

Page 4: ...TERMS PRE INSTALLATION PREPARATION Location and Space Requirements LOCATION AND SPACE REQUIREMENTS Determine the safest and most efficient location for your Comfort Glow cast iron stove Make sure tha...

Page 5: ...n and Space Requirements Cont 6 4 Front 4 36 from Front 42 Ceiling Floor Back Wall Figure 3 Clearances for Standard Installation 29 Must contain a minimum of 1 clearance to combustibles PRE INSTALLATI...

Page 6: ...ST IRON STOVE AND DIRECT VENT BURNER SYSTEM ASSEMBLY 8 Fasten each leg to stove with four 4 M8 x 1 25 20mm bolts Use a flat washer and lock washer with each bolt Tighten bolts into threaded holes on s...

Page 7: ...leveling after stove is in normal stand ing position 13 Carefully lift stove back up on its four attached legs 14 Set top grate into stove top CAST IRON STOVE AND DIRECT VENT BURNER SYSTEM ASSEMBLY Co...

Page 8: ...fit against the back of the burner system 2 Make sure all wire connections to terminals on blower motor and thermal switch where applicable are securely attached and that the screw retaining the green...

Page 9: ...y using the following guidelines Only use Comfort Glow or Simpson Dura Vent GS venting com ponents or kits specifically approved for this stove and burner system Minimum clearance between vent pipes a...

Page 10: ...side walk or a paved driveway located on public property 84 inches 2133mm minimum M clearance under veranda porch deck 12 inches 305mm minimum N clearance above a roof shall extend a minimum of 24 inc...

Page 11: ...this vent sys tem require a minimum clearance of 2 from the top of the pipe and 1 minimum to the sides and bottom Vertical sections of this system require a minimum of 1 clearance to combustible mate...

Page 12: ...s also available see page 18 Follow the same installation procedures used for standard horizontal terminations If installing the snorkel termination below grade basement applications you must provide...

Page 13: ...ening Combustible Wall Vent Opening Figure 23 Installing Horizontal Vent Cap Noncombustible Exterior Figure24 InstallingVinylSidingStandoff CombustibleExterior Interior Wall Surface Screw Vent Cap Hor...

Page 14: ...ntal Venting Vertical V Horizontal H 35 min 20 max Figure 27 Horizontal Termination Configuration for Rigid Venting Using One 90 Elbow Horizontal Venting Vertical V Horizontal H 42 min 32 max 30 elbow...

Page 15: ...t cap onto the last section of vent pipe and seal outer pipe connection with high temperature silicone seal ant as specified in the second warning statement on page 11 Note If the vent pipe passes thr...

Page 16: ...iling installation by following the same procedures outlined in steps 2 through 7 for Flat Ceiling Installation page 15 VENTING INSTALLATION Continued Vertical Termination Configurations Figures 34 an...

Page 17: ...ve at an elevation above 4500 feet in Canada check with local authorities Consultyourlocalgascompanytohelpdeterminetheproperorifice for your location For assistance with any high altitude installation...

Page 18: ...gas supply Follow all local codes CAUTION For propane LP units never connect burner system directly to the propane LP supply This burner system requires an external regulator not supplied Install the...

Page 19: ...ING Test all gas piping and connections for leaks after installing or servicing Correct all leaks at once WARNING Never use an open flame to check for a leak Apply a noncorrosive leak detection soluti...

Page 20: ...re Testing Burner System Gas Connections 1 Open equipment shutoff valve see Figure 41 2 Open propane LP supply tank valve for propane LP burner system or main gas valve located on or near gas meter fo...

Page 21: ...R SYSTEM INSTALLATION Installing Optional Wireless Hand held Remote Control Accessories CGHRC and CGHRCTA Series Removing Replacing Glass Door Figure 44 Removing Switch Plate LO H I P I L O T OFF ON F...

Page 22: ...rate see Figure 52 WARNING Failure to position the parts in accor dance with these diagrams or failure to use only parts specifically approved with this burner system may result in property damage or...

Page 23: ...Wait five 5 minutes to clear out any gas Then smell for gas including near the floor If you smell gas STOP Fol low B in the safety information above If you don t smell gas go to the next step 7 The p...

Page 24: ...th match 4 Keep gas control knob pressed in for 30 seconds after light ing pilot After 30 seconds release gas control knob Now follow steps 10 through 14 column 2 5 Replace glass door see Removing Rep...

Page 25: ...essory OPERATING STOVE WITH BURNER SYSTEM Continued Figure 57 Setting the Selector Switch Gas Control Knob and Variable Control Knob for Remote Operation ON OFF REMOTE LO H I OFF ON P I L O T Selector...

Page 26: ...SEMBLY The pilot assembly is factory preset for the proper flame height Alterations may have occurred during shipping and handling Call a qualified service person to readjust the pilot if necessary Th...

Page 27: ...eaning refer to Installing Logs Lava Rock and Glowing Embers page 23 to properly replace logs Use a vacuum cleaner to remove any carbon buildup on logs Replace log s if broken See Replacement Parts on...

Page 28: ...ty or partially clogged pilot 5 Thermocouple connection loose at con trol valve 6 Thermocouple damaged 7 Control valve damaged REMEDY 1 Reconnect ignitor cable 2 Free ignitor cable if pinched by any m...

Page 29: ...and let warm up for a minute 2 Operate burner until air is removed from line Have gas line checked by local pro pane LP or natural gas company 3 Clean burner see Cleaning and Maintenance page 28 or r...

Page 30: ...See Warning statement above 2 Control valve defective 1 Gas leak See Warning statement above 1 Improper log placement 2 Air holes at burner inlet blocked 3 Burner flame holes blocked OBSERVED PROBLEM...

Page 31: ...mm Weight lbs kg Burner System 70 lbs 31 8 kg 70 lbs 31 8 kg Shipping 75 lbs 34 kg 75 lbs 34 kg When installed in Comfort Glow cast iron stove body CISGA Series and CISCA Series REPLACEMENT PARTS Note...

Page 32: ...formation visit www desatech com 32 ILLUSTRATED PARTS BREAKDOWN CDVBNC CDVBPC LO H I P I L O T OFF ON 27 19 20 21 23 29 30 4 25 1 2 4 4 7 8 9 10 11 13 12 31 15 16 17 18 22 22 28 5 32 3 24 26 1 26 4 26...

Page 33: ...2 14 105468 01 Valve Bracket 1 15 14563 Valve Natural 1 14564 Valve Propane LP 1 16 14561 Pilot Assembly Natural 1 14562 Pilot Assembly Propane LP 1 17 102445 01 Ignitor Piezo 1 18 102334 01 Palnut Fa...

Page 34: ...rmation visit www desatech com For more information visit www desatech com 34 ILLUSTRATED PARTS BREAKDOWN STOVE CHASSIS CISC CISG 1 4 6 4 5 4 5 1 5 2 3 5 3 5 4 2 ILLUSTRATED PARTS BREAKDOWN Stove Chas...

Page 35: ...ttom 1 4 104970 01 One Leg Charcoal 4 Total Per Stove 1 104970 02 One Leg Forest Green 4 Total Per Stove 1 5 104971 01 Hardware Kit 1 5 1 Door Hinge Step Bolt With Shoulder 1 Per Unit 1 5 2 Door Catch...

Page 36: ...they can not supply these accessories call DESA International s Sales Department at 1 866 672 6040 for informa tion You can also write to the address listed on the back page of this manual MANUAL BLO...

Page 37: ...ted College Completed Graduate School 13 Age of Purchaser Under 20 20 29 30 39 40 49 50 59 60 or Over 14 Buyer s total annual household income Under 15 000 15 000 to 19 999 20 000 to 34 999 35 000 to...

Page 38: ...105501 01F For more information visit www desatech com For more information visit www desatech com 38 2701 Industrial Drive P O Box 90004 Bowling Green KY 42102 9004 TM Postage Required TAPE...

Page 39: ...105501 01F For more information visit www desatech com For more information visit www desatech com 39 39...

Page 40: ...l wear and tear or parts that fail or become damaged as a result of misuse accidents lack of proper maintenance or defects caused by improper installation Travel diagnostic cost labor transportation a...

Reviews: