En
gli
sh
Moun�ng
24 / 56
Derksen Lich�echnik
3.
The centre hole and the semi-circular long hole in the
moun�ng plate allow the projector to be posi�oned
through more than 180°.
4.
Use the four cylinder head screws to a�ach the device
stand to the moun�ng plate
4. Moun�ng and installa�on
•
Your new LED projector must be securely installed before you start using it. The moun�ng plate offers you a wide range
of op�ons. Any stable, flat surface is suitable, regardless of its orienta�on.
•
Ensure that the suppor�ng structure can handle this load. It must be able to carry at least four �mes the expected load.
Informa�on about the weight of your device is provided in the technical specifica�ons.
•
Select the fixing materials based on the load, the nature of the support material and the fire and building regula�ons.
4.1. Moun�ng the projector
1.
Loosen and remove the four cylinder head screws on
the side of the device stand.
2.
Disconnect the moun�ng plate from the device stand.
4.2. Connec�ng to the power supply
1.
Unscrew the individual parts of the waterproof inline
connector.
2.
Remove the terminal block.