Edition:03/21_public
10
Manual Storage Heater
Installation
Positioning
Please read the instructions in the introductory section concerning position, safety and load-
bearing capacity.
If in doubt, consult a building engineer.
Transport
To facilitate transport, the heater and the bricks are packaged separately. The 7 bricks per
core column are packed in two’s and three’s.
The heating elements are factory fitted and pre-wired.
Preparation
In order to avoid unnecessary scratching
or other damage to the heater it is advised
to unpack it close to its proposed place of
installation.
Tip the carton on its back and remove the
screws from the wooden palette to which
the base of the heater is attached.
Bring the carton back upright, cut the
bands and pull the carton from the heater.
Remove the wooden battens and the
plastic covering and the take the heater
from its palette.
The
installation
can now begin:
Unscrew the two screws holding the right-hand side panel and, after pulling off the regulator
knob, pull the panel outwards and downwards to remove.