See figure 4.1.
Install auxiliary shaft (2) large spline end first into counterbore in f ace
of barrel and engage barrel spline.
Slide holddown spring assembly (3) onto shaft (2). Install spring retainer (4) into
counterbore.
Thread holddown screw assembly (5) into barrel’s counterbore approximately four
threads.
Tilt barrel vertically and engage main shaft spline with the barrel spline allo wing barrel
to drop in place.
Thread holddown screw assembly (5) into counterbore until it is .25 in., 6,35 mm belo w
barrel face.
PARTS LIST FOR FIGURE 4.1 (P30)
quantity
quantity
item
description
part no.
P30P
P30S
1
barrel & sleeve assembly
S23-12170
1
1
2
auxiliary drive shaft
033-91188
1
1
(no through drive)
auxiliary drive shaft & coupling
(through drive)
3
holddown spring
035-71713
6
6
4
spring retainer
033-91138
1
1
5
barrel holddown nut assembly
S23-12171
1
1
See figure 5
Clean housing (1) and position on a flat surf ace with the large open end
up.
Apply Loctite
Ò
primer grade “T” & Loctite retaining compound #609 per A.P. 01433 to
bearing O.D. & bearing bore of housing. Immediately align & press bearing into hous-
ing bore with a smooth steady force until seated. Install socket head cap screw (3) with
washer (7). Typical two places. Torque to 30 lbs-ft., 40,8 Nm.
Install two dowel pins (4) in the blind holes in the control cover pads. Repeat step
above on the opposite side of the housing.
Install o-ring (5) and plug (6) in the bottom of housing.
PARTS LIST FOR FIGURE 5
item
description
part no.
quantity
1
housing 24
033-57150
1
housing 30
033-57925
2
bearing
033-93046
1
3
screw soc. hd. cap
358-14106
2
5/16-18 x 5/8 w/nylok
4
dowel pin
324-21608
4
5
o-ring
691-00920
1
6
plug
488-35019
1
7
washer 11/32, 8,73 mm steel
345-10020
2
ASSEMBLY PROCEDURE
20
BARREL AND AUXILIARY
DRIVE SHAFT 30 SERIES
FIGURE 4.1
HOUSING ASSEMBLY
Figure 5
SAE-B=S23-17445-
SAE-BB=S23-17449-
SAE-C=S23-17447-
SAE-D=S23-17451-
1
1
1
1
0K
0K
0K
0K
www.comoso.com