1. Getting acquainted with your Water Blaster
MERMAID E500-S
STD08
Page 12 of 52
Machine Installation / setup
Step 1.
Make sure that the machine is operating on flat floor or inclined not more than 10Deg.
The machine must be parked or securely tighten to structure.
Step 2.
Mount the ½” high-pressure hose onto the Water Blaster by
screwing the swivel on to the ½” high-pressure fitting to the HP
water Outlet.
Step 3.
Next, mount the trigger gun with lance to the other end of
the ½” high-pressure hose. Always use two wrenches when
tightening the hoses.
It is important to use FRESH water. Any other liquid or chemical
will damage your pump. Using recycle water, please make sure that
the impurity (sand, stone…) must be filtered. It is recommended to
use additional filter (130um) to filter incoming water before going
into the tank when using recycle water. Please note that any recycle
water not process properly will shorten its pump life span.
Step 4.
Prepare the water supply, by attaching water hose to the
supplied low pressure inlet male-coupling
.
Step 5.
Turn on the water supply tap and fill the water tank with water. When water tank is full,
the water will be cut off.
Step 6.
Connect the main power cord to a grounded 3-phase main power supply.
½” high-Pressure Hose