![Demtech 500-0100/XL/A Operator'S Manual Download Page 15](http://html1.mh-extra.com/html/demtech/500-0100-xl-a/500-0100-xl-a_operators-manual_2479917015.webp)
Rev. D, January 2021
Pro-Wedge XL Operator’s Manual
Page 12
c. Place two of the 1/2" X 6" material pieces, each folded in half, between the Nip
Rollers (1) (see Figure 3). This procedure simulates two layers of material between
the Rollers. Be sure these pieces do not extend past the Nip Rollers into the welder.
Rotate the Nip Pressure Cam (2) (see Figure 3) to the corresponding mil thickness
position indicated on the side of the Pressure Cam by rotating the Nip Pressure Cam
Lever (3) (see Figure 3) clockwise.
Figure 3
2
1
3
Summary of Contents for 500-0100/XL/A
Page 1: ...Pro Wedge XL Operator s Manual Model Number 500 0100 XL A Revision D...
Page 13: ...Rev D January 2021 Pro Wedge XL Operator s Manual Page 10 Figure 1 4 3 4 1 2...
Page 25: ...Rev D January 2021 Pro Wedge XL Operator s Manual Page 22 Figure 8 2 1...
Page 27: ...Rev D January 2021 Pro Wedge XL Operator s Manual Page 24 9 1 Appendix A Diagram 5...