I-1091
Rev. L-43
Installat
Steps
valve
5. To
ins
check
desire
rate o
(
Figur
6. Screw
thread
Note:
produ
7. For
S
over t
For O
neede
weigh
Secur
valve
Note:
allow
8. Positi
comp
SafeL
ceram
9. Close
10. Conn
sourc
a pos
bucke
3223
tion & Prep
s 5 through 7
s located in e
stall metering
k valve in eac
ed metering ti
on the tip char
re 2
)
w metering tip
ded check va
A blank tip c
uct from dispe
afeLink cap a
the exposed c
Open containe
ed and cut to
ht and foot va
re top of tubin
barb
Softening the
the tube to fit
on chemical c
artment in de
Link cap or ins
mic weight into
e and lock the
ect the suppli
ce and activat
ition on the d
et or bottle fill
paration C
7 explain how
each compartm
tips, locate th
h compartme
p based on c
rt for bottle an
p clockwise in
lve barb
an be used to
ensing at bottl
and tubing: se
check valve b
er: Measure b
length. Insta
lve at base of
ng over the ex
e tube with ho
t over the bar
container into
esired position
stall tubing w
o open contai
e cabinet door
ied water hos
e the dispens
ial and using
activation po
ont’d
to install met
ment. Check
for
he correct
ent. Identify
color and dilut
nd bucket fillin
to exposed
o prevent a
e or bucket fi
ecure the tubi
barb (
Figure 3
ulk tubing
all ceramic
f tubing.
xposed check
ot water will
rb with ease
o each
n and connec
foot valve an
iner (
Figure 4
rs
se to your wat
ser by selectin
either the
oint (
Figure 5
)
tering tips. M
k valves to bu
bottle fill do n
tion
ng
ll
ng
3
)
k
t
nd
4
)
ter
ng
Metering tips w
ucket fill have
not.
w
will be installe
a plastic ring
Figure 2
Figure 3
Figure 4
Figure 5
www.demaeng
1-800-325
Page
8/
d at the two c
g, and check v
g.com
-3362
3 of 8
/29/17
check
valves