background image

I-729 

 

Pg 1 of 15 

Rev D 11/01 

 
 

DEMA 813 PROBELESS DEMAMaster

TM

 

INSTALLATION INSTRUCTIONS

 

 
 

 
 

 
 

 

 

 

 

 

 

 
 
 

 

Models:  

DM-813-PLLL-1T 

DM-813-PDLL-1T 

DM-813-PLLL-2T 

DM-813-PDLL-2T 

 

Summary of Contents for Chemaster DM-813-PDLL-1T

Page 1: ...I 729 Pg 1 of 15 Rev D 11 01 DEMA 813 PROBELESS DEMAMasterTM INSTALLATION INSTRUCTIONS Models DM 813 PLLL 1T DM 813 PDLL 1T DM 813 PLLL 2T DM 813 PDLL 2T...

Page 2: ...e The DEMAMaster is supplied with a transformer mounted in housing that allows primary voltage hook up of 120 208 or 240 at 50 60Hz Please read all instructions before proceeding with the DEMAMaster i...

Page 3: ...60Hz The detergent control is normally wired to something that is common to the pump operation thus signaling a wash cycle The rinse control is normally wired to something that is common to the rinse...

Page 4: ...plied in installation kit The power line should be secured by use of a proper electrical fitting through access hole in DEMAMaster enclosure The power line must also be secured properly between the di...

Page 5: ...9 6 40 VA TRANSFORMER 80 70 X20753 1 81 32 1 X20753 2 81 32 2 BLACK RED BLACK RED ORANGE ORANGE X20753 1 81 32 1 MOTOR X20753 6 81 32 6 VALVE X20753 2 81 32 2 MOTOR X20753 7 81 32 7 VALVE 25457 16 81...

Page 6: ...AL BLOCK BRACKET ASSY BLACK WHITE BLUE RED RINSE CONTROL BOARD 80 69 6 PROBLESS DETERGENT CONTROL BOARD 80 77 1 40 VA TRANSFORMER 80 70 ORANGE ORANGE 20774 1 81 94 1 20774 2 81 94 2 X20753 1 81 32 1 X...

Page 7: ...o be cut above the waterline in the side of the dish machine wash tank to accommodate the bulkhead fitting The bulkhead fitting should not be located above the concentration probe When using the deter...

Page 8: ...8 5 6 8 7 1 2 3 4 1 2 3 4 1 2 3 4 5 7 6 8 5 6 7 8 5 6 7 8 1 2 3 4 1 2 3 4 4 3 2 1 5 6 7 8 5 6 7 8 5 8 6 7 1 MIN 35 SEC 2 MIN 5 SEC 2 MIN 10 SEC 2 MIN 15 SEC 2 MIN 20 SEC 2 MIN 25 SEC 2 MIN 35 SEC 2 M...

Page 9: ...ur 6 1 4 3 2 5 6 5 2 3 4 1 6 6 5 2 3 4 1 1 4 3 2 5 6 6 1 4 2 3 5 1 4 2 3 5 6 6 5 2 3 4 1 1 4 3 2 5 0 CYCLES 1 CYCLE 2 CYCLES 3 CYCLES 4 CYCLES 5 CYCLES 6 CYCLES 7 CYCLES 2 MIN 45 SEC 2 MIN 30 SEC 2 MI...

Page 10: ...le Initial Charge Clock is set for 2 hours If no power has been supplied to the probeless control for at least 2 hours the pro bless control will provide an initial charge the next time power is suppl...

Page 11: ...hen the chemical has filled the tubing up to the injection point On the rinse side this can only be done during the time the rinse solenoid is active On the front cover there is a button labeled Sani...

Page 12: ...f 15 Rev D 11 01 2 6 8 9 15 18 19 20 24 FOR 813 MODELS 18 17 3 FOR 812 MODELS 16 21 7 9 34 5 35 14 30 13 31 32 33 1 OPTIONAL SOLENOID VALVE 29 28 DETERGENT UNITS WITH 2 TRANSFORMERS UNITS WITH 1 TRANS...

Page 13: ...s Detergent Control circuit board for controlling detergent 16 80 69 5 1 for 812 Models Rinse Control Board circuit board for controlling rinse 17 80 69 6 1 for 813 Models Rinse Sanitizer Control Boar...

Page 14: ...et 25 67C2 2 C2 Pump Head 25 84C2 C2 Roller Block 2 roller 25 83C2 2 C2 Face Plate 25 85S 10 32 X 1 Machine Screw 25 85L 10 32 X 2 Machine Screw 25 C2D C2 Pump Head Kit kit includes C2 Pump parts list...

Page 15: ...improper voltage supply physical abuse or misapplication Rubber and synthetic parts such as O rings diaphragms squeeze tubing and gaskets are considered expendable and are not covered under warranty...

Reviews: