Introduction 

 
Congratulations on your purchase of a Deltec Twin-Tech Calcium Reactor, described by Reefbuilders as 

the “Supercar of Calcium Reactors” 

 

These instructions will guide you through the installation and running of your new reactor with tips and 

advice for getting the most from your unit 

 

Models, tank size and overall footprint 

 

 

Twin-Tech 1500

 – for aquariums up to 1,500 litres – 310 x 180 x 590mm

 

 

Twin-Tech 3000

 – for aquariums up to 3,000 litres – 390 x 240 x 590mm

 

 

Twin-Tech 10000

 – for aquariums up to 10,000 litres – 440 x 300 x 920mm

 

 

Principle 

 
This latest generation reactor operates on the principle of total CO2 saturation by the continuous 

recirculating of the water in the reactor through a large bubble of gas. 

 

The CO2 dissolves in the water until it is fully saturated, which occurs at a very low pH, at which point no 

further gas can be dissolved until additional water is added to the reactor. 

 

The whole process is controlled automatically by the digital controller and float switch in the gas chamber. 

As the CO2 bubble dissolves in the water, the water level rises, which raises the float switch and triggers the 

solenoid valve to add more gas to replenish the bubble. 

 

Features 

 
This innovative reactor has several unique features providing simplicity of control but also relating to the 

way that the system feeds the reactor with water from the aquarium. 

 

The smart controller on the Twin-Tech uses a flow meter to accurately measure the volume of water passing 

into the reactor, it uses this information to control a standard DC feed pump. 

 

This feature allows the user to know exactly how much reactor effluent, in litres, is being added to the 

aquarium within each 24-hour period, which is shown on a large LCD display in the centre of the controller. 

The water flow can be adjusted by the user between 10 and 350lt per day simply by pressing two up and 

down buttons on the panel. 

 

Contents 

 

The reactor as standard consists of the following items. (There are some small variations between models) 

 

1 – Large media chamber. 

2 – Smaller gassing chamber with float switch. 

3 – Controller with separate power supply unit. 

4 – Recirculation pump and connections. 

5 – Feed pump with suction filter. 

6 – Low voltage solenoid valve. 

7 – Hoses and non-return valves to connect the unit. 

 

Not included 

 

1 – CO2 bottle, CO2 regulator (important, 2 stage regulator is required) and CO2 hose. 

2 – Calcium reactor media. 

 

 

Summary of Contents for Twin-Tech 10000

Page 1: ...INSTALLATION INSTRUCTIONS FOR THE DELTEC TWIN TECH CALCIUM REACTORS...

Page 2: ...the float switch and triggers the solenoid valve to add more gas to replenish the bubble Features This innovative reactor has several unique features providing simplicity of control but also relating...

Page 3: ...ation pump speed 5 Non return valve E Process active complete 6 Solenoid valve F Increase button for items marked 7 Float switch G Decrease button for items marked 8 CO2 bottle and Regulator H Activit...

Page 4: ...the pipe in the middle of the reactor whilst filling Note You have an option to fill the larger media chamber with water at this stage whilst the lid is removed Step 5 Replace the lid on the media cha...

Page 5: ...ed pump connection green line Recirculation pump connection red line Connect the cables and pumps in the positions shown on the layout diagram on page 2 but do not plug the power supply into the mains...

Page 6: ...ngth of the bleed nipples with short lengths of hose that extend into a container above the height of the reactor Put the end of the outlet pipe into the same container Apply power to the control pane...

Page 7: ...adding small amounts of water to the reactor during the final filling stage B Water Flow The LED display gives a readout of the total water effluent that passes through the reactor in a 24 hour period...

Page 8: ...the pump but will normally take about 1 2 minutes to complete F G Up and down buttons These are self explanatory and used to control the levels up and down of functions B C and D above H Activity ind...

Page 9: ...this is not the case then you have not correctly removed all of the air from the recirculation pump body Remove the power from the controller and bleed the reactor again If the water is observed circu...

Page 10: ...omes stable this is now your dialled in flow rate Set the de gas volume to be the same Existing calcium reactor If you are converting from an existing calcium reactor then it is fairly easy to calcula...

Page 11: ...uild up of inert gas released from the media On the chart below you can see the initial rapid drop from normal tank pH as the reactor is first switched on and the 2 peaks B C just before each degas cy...

Page 12: ...ing solution such as D D Ezyclean through this component and collect into a separate container You can either used the supplied feed pump continuously triggering the pump run function or another suita...

Reviews: