INSTALLATION INSTRUCTIONS FOR THE DELTEC TWIN-TECH CALCIUM REACTORS 
 

 

 
 

Summary of Contents for Twin-Tech 10000

Page 1: ...INSTALLATION INSTRUCTIONS FOR THE DELTEC TWIN TECH CALCIUM REACTORS...

Page 2: ...the float switch and triggers the solenoid valve to add more gas to replenish the bubble Features This innovative reactor has several unique features providing simplicity of control but also relating...

Page 3: ...ation pump speed 5 Non return valve E Process active complete 6 Solenoid valve F Increase button for items marked 7 Float switch G Decrease button for items marked 8 CO2 bottle and Regulator H Activit...

Page 4: ...the pipe in the middle of the reactor whilst filling Note You have an option to fill the larger media chamber with water at this stage whilst the lid is removed Step 5 Replace the lid on the media cha...

Page 5: ...ed pump connection green line Recirculation pump connection red line Connect the cables and pumps in the positions shown on the layout diagram on page 2 but do not plug the power supply into the mains...

Page 6: ...ngth of the bleed nipples with short lengths of hose that extend into a container above the height of the reactor Put the end of the outlet pipe into the same container Apply power to the control pane...

Page 7: ...adding small amounts of water to the reactor during the final filling stage B Water Flow The LED display gives a readout of the total water effluent that passes through the reactor in a 24 hour period...

Page 8: ...the pump but will normally take about 1 2 minutes to complete F G Up and down buttons These are self explanatory and used to control the levels up and down of functions B C and D above H Activity ind...

Page 9: ...this is not the case then you have not correctly removed all of the air from the recirculation pump body Remove the power from the controller and bleed the reactor again If the water is observed circu...

Page 10: ...omes stable this is now your dialled in flow rate Set the de gas volume to be the same Existing calcium reactor If you are converting from an existing calcium reactor then it is fairly easy to calcula...

Page 11: ...uild up of inert gas released from the media On the chart below you can see the initial rapid drop from normal tank pH as the reactor is first switched on and the 2 peaks B C just before each degas cy...

Page 12: ...ing solution such as D D Ezyclean through this component and collect into a separate container You can either used the supplied feed pump continuously triggering the pump run function or another suita...