Condition
Green LED
Red LED
Standby or Countdown
FLASH *
OFF
Power ON
ON
OFF
Error or Fault
OFF
ON
Night time (No DC)
OFF
OFF
Bootloader mode
FLASH *
* ON 1s / OFF 1s
Table 5-1 LED indicator
Figure 5-2 Country and language settings for first startup
Figure 5-3 Home page
5.2. First startup
At first startup, please supply AC power to the inverter. After the LCD display
panel comes live, please set Language and Country according to your
regionn and make sure that there is no any error, fault or warning showing
on home page. Now you can feed in DC power and switch ON the DC switch.
If there is enough power generated from PV array, inverter will start to feed
in power to grid.
21. Jun 2010 13:50
Select Country
–
1/3
ENT
EXIT
21. Jun 2010 13:50
No
Yes
Confirm Country
21. Jun 2010 13:50
English
Deutsch
Français
Italiano
Español
Nederlands
Select Language
First Startup
Australia
Austria
Belgium
China
Czech
England
France
Are you sure to set county :
xxxxxxxx
ENT
EXIT
5.2.1. Home Page
When inverter is operating normally, the LCD will display the homepage
as shown in
Figure 5-3
, user can get the information of output power,
inverter status, E-today, date and time.
E-Today: 47kWh
21. Jun 2010 13:50
Runtime: 8.2Hrs
Power: 12103W
On Grid
20
15
10
5
0 4
8
12
16
20
24
Today Energy
Today Runtime
Inverter Status
Today Power Curve
Day - Time
Output Power
24
Turn on/off PV inverter
Summary of Contents for RPI Series
Page 2: ......
Page 52: ......
Page 53: ...RPI M15A M20A The power behind competitiveness www deltaww com English 1 53 103...
Page 55: ...55...
Page 57: ...2 1 RPI M15A M20A 2 1 2 2 1 2 2 2 1 2 2 57...
Page 58: ...2 2 RPI M15A RPI M20A 1 1 pcs 1 pcs 1 pcs 1 pcs RPI 2 3 AC AC 4 5 DC 4 sets DC 2 1 58...
Page 59: ...2 3 2 3 2 3 59...
Page 61: ...PV array IEC 61730 Class A 3 AC DC 1 12 M6 3 3 2 3 2 M6 3 4 3 1 61...
Page 63: ...M6 Screw 6 Wall M6 Screw 6 3 3 3 4 M6 Screw 63...
Page 64: ...3 5 25 60 40 30 cm 20 cm 50 cm 30 cm 30 cm 3 5 64...
Page 89: ...6 1 6 1 PV Inverter 6 AC DC 6 1 89...
Page 90: ...6 2 6 3 6 2 6 3 6 3 4 90...
Page 97: ...8 AC DC OFF voltmeter AC DC AC DC RS 485 97...
Page 103: ...RPI M15A M20A The power behind competitiveness www deltaww com English 1 53 103...
Page 105: ...105...
Page 107: ...2 1 RPI M15A M20A 2 1 2 2 1 2 2 2 1 2 2 107...
Page 108: ...2 2 RPI M15A RPI M20A 1 1 pcs 1 pcs 1 pcs 1 pcs RPI 2 3 AC AC 4 5 DC 4 sets DC 2 1 108...
Page 109: ...2 3 2 3 2 3 109...
Page 111: ...PV array IEC 61730 Class A 3 AC DC 1 12 M6 3 3 2 3 2 M6 3 4 3 1 111...
Page 113: ...M6 Screw 6 Wall M6 Screw 6 3 3 3 4 M6 Screw 113...
Page 114: ...3 5 25 60 40 30 cm 20 cm 50 cm 30 cm 30 cm 3 5 114...
Page 139: ...6 1 6 1 PV Inverter 6 AC DC 6 1 139...
Page 140: ...6 2 6 3 6 2 6 3 6 3 4 140...
Page 147: ...8 AC DC OFF voltmeter AC DC AC DC RS 485 147...
Page 153: ......
Page 154: ...Version 05190319 5013242902...