Quick installation guide for RPI H3 inverters EU EN 5013227802 02 2016-01-05
Commissioning - basic settings
11
To execute commissioning, the inverter needs to be pow-
ered either by AC (the grid) or DC (the solar modules)
N e x t / E n t e r
U K G 8 3 - 2
1.
Use the button
SEL
to select your country or grid.
To conirm your selection, press the button
ENT
.
N / Y
E x i t ?
2.
To inish the country selection, press the button
ENT
.
To select another country or grid, press the button
SEL
and repeat step 1.
þ
The basic setup is inished. The main menu is shown.
3 . 0 k V A
I n v e r t e r
Setting the inverter ID
If your PV plant contains multiple inverters, for each of the inverters a different inverter ID has to be set.
The inverter ID is needed to identify each inverter via RS485. For a description of the RS485 connection,
see “Connecting to a datalogger via RS485”, p. 14.
I D : 1
I n v e r t e r
1.
In the main menu, use the button
SEL
to select
Inverter ID
.
2.
Press the buttons
SEL
and
ENT
at the same time and hold them for at least 3 seconds.
→
The menu to change the inverter ID is shown.
I D = 1 ?
S e t t i n g I D :
I D = 2 ?
S e t t i n g I D :
3.
Use the button
SEL
to change the inverter ID.
4.
To conirm the value, press the button
ENT
.
→
The new inverter ID is shown in the main menu.
I D : 2
I n v e r t e r