General safety instructions

1

DANGER

High electrocution

Potentially fatal voltage is applied to the solar 
inverter during operation. This potentially fatal 
voltage is still present for 15 seconds after all 
power sources have been disconnected.

 

Never open the inverter. 

 

Always disconnect the inverter from 
power before installation, open the DC 
disconnection switch and make sure neither 
can be accidentally reconnected.

 

Wait at least 15 seconds until the capacitors 
have discharged.

DANGER

High electrocution

Potentially fatal voltage may be applied to the 
DC connections of the solar inverter. When light 
is falling on solar modules, they immediately start 
producing energy. They do so, even when the 
sun is not shining.

 

Never disconnect the solar modules when the 
solar inverter is powered. 

 

First switch off the grid connection so that 
the solar inverter cannot feed energy into the 
grid. 

 

Turn the 

DC disconnection switch

 to position 

OFF

.

 

Make sure the DC connections cannot be 
accidentally touched.

 

Read this quick installation guide 

before

 you start installing 

the inverter.

 

The inverter can safely and normally be operated if installed 
and used in accordance with this manual (see IEC 62109-
5.3.3). Delta Energy Systems is not responsible for damage 
incurred by failure to observe the installation and commis-
sioning instructions in this manual. For this reason, be sure 
to observe and follow all instructions!

 

Installation and commissioning may only be performed by 

qualiied electricians using the installation and commission

-

ing instructions found in this manual.

 

The inverter must be disconnected from power and the solar 
modules before any work on it can be performed.

 

The inverter has a high leakage current value. The ground 
wire 

must

 be connected before commissioning.

 

Do not remove any warning signs that the manufacturer has 
installed on the solar inverter.

 

Improper handling of the inverter may result in physical injury 
and damage to property. For this reason, observe and follow 
all general safety instructions and warnings.

 

The inverter contains no components that must be main-
tained or repaired by the operator or installer. All repairs must 
be performed by Delta Energy Systems. Opening the cover 
will void the warranty.

 

Do not disconnect any cables when the solar inverter is pow-
ered due to risk of a fault arc.

 

To prevent lightning strikes, follow the relevant regulations 
applicable in your country.

 

The surface of the solar inverter can become very hot dur-
ing operation. Use safety gloves when working on the solar 
inverter.

 

Only devices in compliance with SELV (EN 69050) may be 
connected to the RS485 interfaces.

 

● All connections must be suficiently insulated in order to com

-

ply with the IP65 protection rating. Unused connections must 
be closed by placing cover caps on the solar inverter.

Summary of Contents for RPI H3 110

Page 1: ...Quick Installation Guide RPI H3_110 Europe...

Page 2: ...3_110 with irmware version DSP 2 02 RED 2 01 COMM 2 00 If you experience deviations between the descriptions in this quick installation guide and the information on the inverter dis play please check...

Page 3: ...ailure to observe the installation and commis sioning instructions in this manual For this reason be sure to observe and follow all instructions Installation and commissioning may only be performed by...

Page 4: ...verter feeds into the grid AlArm Alarm Red Indicates an error fault or warning Buttons SEL Select Move to the next menu entry Change a value Cancel value setting ENT Enter Select menu item Open conigu...

Page 5: ...nty Read the manual delivered with the inverter before working with the solar inverter and follow the instructions contained in the manual The housing of the inverter must be grounded if this is requi...

Page 6: ...outdoor but protected by a roof against direct sun rain or snow Where to mount the inverter Mount the inverter so that the LEDs and display can be eas ily seen and that the buttons can be operated Mak...

Page 7: ...gs correctly in the mounting plate and screw the inverter to the mounting plate Fasten the mounting plate with 6 M5 screws to the wall 1 2 3 4 Ground the inverter housing Washer spring Washer M4 Screw...

Page 8: ...rter Due to its design the inverter is not capable of feeding DC resid ual current back into the grid It fulils this requirement in accor dance with DIN VDE 0100 712 When examining these possible faul...

Page 9: ...52 5 mm 12 mm 55 mm PE 3 Place a wire end sleeve on each wire end and crimp them on tightly 4 Connect the AC cable to the AC plug as described below Unscrew the cable nut from the cable housing Remove...

Page 10: ...ocket insert until you can hear a click sound CLICK Fasten the cable nut to the cable housing typical torque 4 1 Nm 4 1 Nm Insert the AC plug into the AC connector on the inverter until you can hear a...

Page 11: ...in cable Always follow the system installation requirements deined for your country Grounding the inverter The inverter must be grounded via the AC connector s PE con ductor To do this connect the PE...

Page 12: ...switch to position OFF Never disconnect the solar modules when the solar inverter is powered First switch off the grid connection so that the solar inverter cannot feed energy into the grid Make sure...

Page 13: ...001 UR 5 5 9 32 0016P0001 UR DC 1 5 2 5 3 6 32 0011P0001 UR 5 5 9 32 0013P0001 UR 4 6 3 6 32 0015P0001 UR 5 5 9 32 0017P0001 UR France Safety caps are needed for each DC input that is connected to a s...

Page 14: ...istor RS485 is used to connect the inverters of the PV plant via a data logger to a monitoring system For connecting RS485 terminals 3 4 or 5 6 are used It does not matter which pair of terminals you...

Page 15: ...sistor on the irst inverter in the RS485 line RS485 ON OFF ON OFF ON OFF Datalogger Termination resistor ON Termination resistor OFF Termination resistor OFF Connecting a single inverter to a datalogg...

Page 16: ...eak into the inverter The terminal blocks inside are not easily accessible 2 1 Pos Designation 1 Dry contacts 2 Digital inputs and outputs Digital inputs 1 2 3 4 5 6 Pin Designation 1 Digital input 1...

Page 17: ...crew and carefully pull out the terminal block of the dry contacts Unscrew and carefully pull out the terminal block of the digital inputs Carefully put in the terminal block of the digital inputs and...

Page 18: ...kVA Inverter Setting the inverter ID If your PV plant contains multiple inverters for each of the inverters a different inverter ID has to be set The inverter ID is needed to identify each inverter vi...

Page 19: ...econds the following message is displayed Shut down Inverter 19200 Baud rate 3 Use the button SEL to select Baud rate and press the button ENT Next Enter 9600 4 Use the button SEL to select another ba...

Page 20: ...Shut down Inverter 14 05 26 11 2014 3 Use the button SEL to select the entry with time and date To change the setting press the button ENT The day is lashing 14 05 26 11 2014 4 Use the button SEL to c...

Page 21: ...r a few seconds the following message is displayed Shut down Inverter English Language 3 Use the button SEL to select Language and press the button ENT Next Enter Deutsch 4 Use the button SEL to selec...

Page 22: ...P trackers 1 Number of DC inputs 2 Galvanic isolation No Overvoltage category 2 II Output AC RPI H3 Maximum apparent power 3000 VA Nominal apparent power 3000 VA Voltage range 3 230 V 20 22 1 phase L...

Page 23: ...RPI302N63E0000 Maximum eficiency 97 0 EU eficiency 96 2 Operating temperature range 25 60 C Operating temperature range without derating 25 40 C Storage temperature range 25 60 C Relative humidity 0 9...

Page 24: ...com 0800 800 9323 free call Greece support greece solar inverter com 49 7641 455 549 Israel supporto israel solar inverter com 800 787 920 free call Italy supporto italia solar inverter com 800 787 9...

Reviews: