background image

69363   Rev. C

2

69363   Rev. C

3

Installation and Connections / Instalación y conesiones / 

安装和连接 

/

설치 및 연결을 

/

 

Instalação

 

 

Install flange(1) and shower arm(2). 

Note: 

To prevent damage to finish on shower arm, insert wall end of shower arm into shower flange (3) before screwing 

安装法兰

(1)

和弯管

(2)

。注意: 避免损坏弯管上面的镀层,将弯管拧入管道之前先将弯管装入法兰。

Parts / Piezas / 

零件图

 / 

부품

 / Partes  

arm into riser connection.   

2

1

RP60672

RP60230

RP60274

IAO35081

RP48332

RP49139

RP48959

IAO35081

RP60230

RP49139 / RP48332 / RP60672 / 

RP60674 / IAO35081

RP49139 / RP48332 / RP60672 / RP60674  / IAO35081

RP60230 / RP48959

RP60230 / RP48959

RP60674

RP48959

RP60672

RP6023

RP6023

RP48963

RP46872

RP48331

RP48331

RP48963

RP90249

RP6025

RP76838

(128mm)

4 13/16"

5 1/16"

(122mm)

(

0~10

mm)

0

"~13/32"

(59mm)

2 5/16"

(128mm)

4 13/16"

5 1/16"

(273mm)

10 3/4"

(240mm)

9 7/16"

(122mm)

(59mm)

2 5/16"

(36mm)

1 7/16"

1 / 2-14 NPT

1 / 2-14 NPT

G 1/2- ISO228/1

G 1/2- ISO228/1

1 / 2-14 NPT

(

0~10

mm)

0

"~13/32"

PL

UM

BER TAPE

PL

UM

BER TAPE

(Φ 64mm)

Φ 2 1/2"

(Φ 64mm)

Φ 2 1/2"

(65mm X 65mm)

2 9/16" X 2 9/16"

Instale Reborde(1) y Codo(2).  Atención: 1. Para evitar el daño al revestimiento de los codos, instale los codos en los rebordes antes de retrocerlos en el   

conducto.

플랜지

(1)

 

곡관을

 

설치

주의

:

곡관위

 

도층의

 

손상을

 

피면하여

곡관

 

배관과

 

죠인트전

 

곡관을

 

플랜지에

 

설치한다

.

Montagem de flange (1) e tubo curvado (2). 

Nota:

 Evite o revestimento sobre o tubo curvado, e instale o tubo curvado no flange antes de montagem de

 tubo curvado no tubo.

(433mm)

17 1/16"

(400mm)

15 3/4"

(36mm)

1 7/16"

G 1/2- ISO228/1

G 1/2- ISO228/1

(65mm X 65mm)

2 9/16" X 2 9/16"

1 / 2-14 NPT

RP76838

2

1

(Φ 64mm)

Φ 2 1/2"

(51mm)

2"

(229mm)

9"

(238mm)

9 3/8"

1 / 2-14 NPT

1 / 2-14 NPT

RP90250

Reviews: