21
Quick Installation Guide for Solar Power Inverter M50A_12s EU V4 EN 2018-10-24
To perform the commissioning steps described
in this section the inverter must be supplied with
either AC power (grid) or DC power at both DC
inputs (solar modules)
1.
Turn the AC/DC disconnector to the
ON
position
Français
Deutsch
English
Select language
2.
Use the
and
buttons to select the
English
language and then press the
ENT
button
France LV VFR2014
G59-3 230 HV
GERMANY LV
GERMANY MV
INDIA
3.
Use the
and
buttons to select your country or mains type and then press
the
ENT
button
Yes / No
UK G59-3 230
set country:
Are you sure to
4.
Check that the correct country or mains type is selected
If the correct country is selected, use the
and
buttons to select the
Yes
entry and the press the
ENT
button
To change the selection, press the
EXIT
button
→ The inverter starts a self-test lasting approx 2 minutes The remaining time is
shown on the display
Sunspec prot.
Delta/Solivia prot.
NOTICE
The Delta protocol is the Delta Modbus protocol and is intended for utilization with the
Delta Service Software
5.
Use the
and
buttons to select SUNSPEC as RS485 protocol option and
then press the
ENT
button
Yes / No
Sunspec prot.
set protocoll:
Are you sure to
6.
Check that the correct protocol is selected
If the protocol is selected, use the
and
buttons to select the
Yes
entry and
then press the
ENT
button
Press the
EXIT
button to change the selection
ID=001
Setting ID:
NOTICE
If multiple inverters are connected to the PV system then a different inverter ID must set for
each inverter For example, the inverter ID is used in monitoring systems to uniquely iden-
tify each inverter
7.
Use the
and
buttons to set the individual digits and then press the
ENT
button
Commissioning – basic settings