3.13 Installation of BX12.6_AC100
- Before expansion battery pack, please power OFF the unit entirely to avoid risk
of electrical shock.
- Please check the battery pack regularly. If there are any impaired or loose parts,
please contact your installer. Ensure that there are no fallen objects.
- Please do not remove all the rubber covers on BX6.3_AC100 if BX6.3_EX100
is not installed.
For the higher capacity system - BX12.6_AC100, BX6.3_AC100 should be installed
with the BX6.3_EX100 as the following instruction.
1. Connect positive/negative cable from BX6.3_EX100 to BX6.3_AC100
2. Connect Communication cable (3 wires) from BX6.3_EX100 to BX6.3_AC100
3. Connect grounding cable from BX6.3_EX100 to BX6.3_AC100.
Recommended cable length (about 1000mm) / 12AWG with ring terminal lug.
Please make sure the polarity is properly connected as shown below.
Figure 3-17 : Expanding the Battery Pack with DC(BT+/-) cables
DANGER: ELECTRICAL HARZARD!!
①
Uart signal
②
Relay signal
③
Heater signal
① ② ③
Ground
ATTENTION
* BT+/-:
Recommended cable length (about 1000mm) / 12AWG
BT+
BT-
BX6.3_EX100
BX6.3_AC100