•
Do not mount the equipment with the utility panel facing in the downward position.
NOTE:
The illustrations in this document are not intended to represent a specific switch.
System install and remove
1
Align the system with rails and slide the system into rack.
2
Tighten the screws on each side of the systems’s front panel, item 1.
To remove the system from the rack, loosen the screws and slide the system out of the rack.
Figure 17. S6100–ON system installation
1
Extra screws to restrict front-back movement of the switch
2
Main screw
Chassis ground
After you mount the chassis, secure the chassis ground as follows:
To properly ground the chassis, Dell recommends using the two-hole lug shipped in a separate plastic bag with your chassis. The two-hole
lug must be a UL recognized, crimp-type lug. To connect the ground cable to the framework or cabinet and to mount the unit, use thread-
forming unit mounting screws that remove paint or nonconductive coatings.
CAUTION:
Grounding conductors must be made of copper. Do not use aluminum conductors.
S6100–ON installation
25