![Dell S6000-ON Installation Manual Download Page 18](http://html.mh-extra.com/html/dell/s6000-on/s6000-on_installation-manual_84559018.webp)
Figure 7. Two-post flush-mount configuration
2
Attach one rail to the front post flange with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied
screws, item 3.
4
Repeat this procedure for the second rail.
Two-post center-mount configuration
CAUTION:
Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied
screws, item 1.
18
S6000–ON installation