The end user administrator can select the desired power package to use depending on the system usage.
With Intel ME WoL, after the time-out timer expires, the Intel ME remains in the M-off state until a command is sent to the
ME. After this command has been sent, the Intel ME will transition to an M0 or M3 state and will respond to the next
command that is sent. A ping to the Intel ME will also cause the Intel ME to go into an M0 or M3 state.
The Intel ME takes a short time to transition from the M-off state to the M0 or M3 state. During this time, Intel AMT will not
respond to any Intel ME commands. When the Intel ME has reached the M0 or M3 state, the system will respond to Intel ME
commands.
The following table illustrates the details of the power packages.
Power Package
1
2
S0
ON
ON
S3
OFF
ON/ ME WoL
S4/S5
OFF
ON/ ME WoL
Select the desired Power Policy and press <Enter>.
NOTE:
Changing a system into the provisioning state will automatically switch to Power Package 2. This can later be
changed through WebUI, the management console, or MEBx.
Idle Time Out
Under the Intel ME Power Control menu select
Idle Time Out
and press <Enter>.
Summary of Contents for Precision M4500
Page 69: ...4 Click the to expand the Intel AMT Getting Started section ...
Page 70: ...5 Click the to expand the Section 1 Provisioning section ...
Page 71: ...6 Click the to expand the Basic Provisioning without TLS section ...
Page 74: ...10 The IP address for the ProvisionServer and Intel SCS are now visible ...
Page 75: ...11 Select Step 2 Discovery Capabilities ...
Page 77: ...13 Select Step 3 View Intel AMT Capable Computers ...
Page 78: ...14 Any Intel AMT capable computers on the network are visible in this list ...
Page 79: ...15 Select Step 4 Create Profile ...
Page 80: ...16 Click the plus symbol to add a new profile ...
Page 84: ...22 Select Step 5 Generate Security Keys ...
Page 85: ...23 Select the icon with the arrow pointing out to Export Security Keys to USB Key ...
Page 86: ...24 Select the Generate keys before export radio button ...
Page 94: ...37 Select Step 7 Monitor Provisioning Process ...
Page 96: ...39 Select Step 8 Monitor Profile Assignments ...
Page 99: ......
Page 105: ......