24
Rack Installation Guide
4
Using the two nuts that you removed in step 2, tighten the nuts finger tight to secure
the adjustable mounting bracket (see Figure 1-14).
5
Repeat step 2 through step 4 to configure the other mounting rail.
Figure 1-14.
Configuring the Adjustable Mounting Bracket for Flush-Mount Installation
6
Holding the left mounting rail at the location you marked, position the flush-mount
mounting flange against the front of the vertical two-post rack and secure it to the two-post
rail with two 12-24 x 0.5-inch pan-head Phillips screws (see Figure 1-15).
7
Slide the adjustable-mounting bracket so that it is against the back of vertical two-post rack
and secure it to the two-post rail with two 12-24 x 0.5-inch pan-head Phillips screws
(see Figure 1-15).
8
Repeat step 6 and step 7 to install the right mounting rail in the rack.
9
Using a 3/8-inch wrench or nut driver, tighten the nuts on the adjustable mounting brackets
on both mounting rails.
nuts (2 per bracket)
flush-mount
mounting flange
7.62-cm (3-inch) wide, flush-mount, threaded studs
adjustable mounting bracket
Summary of Contents for PowerEdge 860
Page 2: ......
Page 3: ...Rack Installation Guide ...
Page 30: ...28 Index 28 Index ...
Page 31: ...Guide d installation du rack ...
Page 56: ...54 Guide d installation du rack ...
Page 59: ...Rack Installationsanleitung ...
Page 84: ...82 Rack Installationsanleitung ...
Page 87: ...ラック取り付けガイド ...
Page 112: ...110 ラック取り付けガイド ...
Page 115: ...Guía de instalación del rack ...
Page 140: ...138 Guía de instalación del rack ...