Rack Installation Guide
11
To mark the rack, perform the following steps:
1
Place a mark (or tape) on the rack's front vertical rails where you want to locate the bottom
of the system you are installing in the rack.
The bottom of each 1-U space is at the middle of the narrowest metal area between holes
(marked with a horizontal line on some rack cabinets—see Figure 1-4).
2
Place a mark 44 mm (1.75 inches) above the original mark you made (or count up three holes
in a rack that meets EIA-310 standards) and mark the rack's front vertical rails with a felt-
tipped pen or masking tape (if you counted holes, place a mark just above the top hole). This
mark or piece of tape indicates where the system's upper edge will be located on the vertical
rails (see Figure 1-4).
Figure 1-4.
Marking the Vertical Rails
tape on vertical rail
Summary of Contents for PowerEdge 860
Page 2: ......
Page 3: ...Rack Installation Guide ...
Page 30: ...28 Index 28 Index ...
Page 31: ...Guide d installation du rack ...
Page 56: ...54 Guide d installation du rack ...
Page 59: ...Rack Installationsanleitung ...
Page 84: ...82 Rack Installationsanleitung ...
Page 87: ...ラック取り付けガイド ...
Page 112: ...110 ラック取り付けガイド ...
Page 115: ...Guía de instalación del rack ...
Page 140: ...138 Guía de instalación del rack ...