
20
Rack Installation Guide
Attaching the Cable-Management Arm Retainer
The cable-management arm retainer keeps the cable-management arm in place. To attach the cable-
management arm retainer:
1
Connect the release latch on the
cable-management arm
retainer to the tab on the outer slide
assembly. See Figure 1-10.
NOTE:
Attach the
cable-management arm retainer to the side opposite of where you attach the cable-management
arm (see Figure 1-10).
2
Fold the
cable-management arm
retainer until it locks into place behind the
cable-management arm.
To unlock the cable-management arm retainer:
1
Press the blue button on the
cable-management arm r
etainer while lifting the retainer arm.
2
Rotate the arm of the retainer to an open position.
Figure 1-10.
Cable-Management Arm Retainer
Replacing the Rack Doors
See the procedures for replacing doors in the documentation provided with your rack cabinets.
This completes the rack installation of your system.
1
release latch on cable-
management arm retainer
2
cable-management arm retainer
3
blue button
4
metal tab
1
4
back of system
2
3
Summary of Contents for PowerEdge 2900
Page 2: ......
Page 3: ...Rack Installation Guide ...
Page 6: ...4 Contents ...
Page 23: ...Guide d installation du rack ...
Page 26: ...24 Sommaire ...
Page 44: ...42 Guide d installation du rack ...
Page 45: ...Rack Installationsanleitung ...
Page 48: ...46 Inhalt ...
Page 67: ...ラック取り付けガイド ...
Page 70: ...68 目次 ...
Page 88: ...86 ラック取り付けガイド ...
Page 89: ...Guía de instalación del rack ...
Page 92: ...90 Contenido ...
Page 110: ...108 Guía de instalación del rack ...