-
15
-
5.2. Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, materials as bellow
:
1) Working table
2) Philips-head screwdriver
3) Hex-head screwdriver
4) Gloves
5) Cleaning cloth
6) ESD protection
7) U3415 Curve Sponge Jig
Item
Picture
Operation
Tools
Notes
1
1. Insert EDP cable to I/F BD
and stick a tape to fix EDP
cable on I/F BD
2. Place I/F BD into Main SHD
3. Connect SPS BD to I/F BD
wire to I/F BD and SPS BD,
then, place SPS BD into
Main SHD
4. Connect SPS BD to LED
Driver BD wire to SPS BD
and LED Driver BD, then,
place LED Driver BD into
Main SHD
Do not
touch the
component
without
wearing
insulating
gloves
when
disassembli
ng and
assembling
SPS BD
2
1.
Lock 10 PCBA screws
Philips-
head
screwdrive
r
Torsion of
PCB
screw:
9±1Kg
Summary of Contents for P3421WB
Page 1: ... 1 Service Manual P3421WB Version 01 Date 2021 10 08 ...
Page 6: ... 6 2 Exploded view diagram with list of items 22 23 24 25 26 ...
Page 8: ... 8 3 Wiring connectivity diagram Wire1 FFC 1 FFC 2 Wire2 Wire3 Wire4 ...
Page 18: ... 18 6 Trouble shooting instructions ...
Page 19: ... 19 ...
Page 20: ... 20 ...
Page 21: ... 21 ...
Page 22: ... 22 ...
Page 23: ... 23 ...
Page 24: ... 24 ...
Page 25: ... 25 ...
Page 26: ... 26 ...